Tri-gen
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am QA'ing a model for a building that will be fed via a cogeneration plant (with absorption chillers) and therefore is a little complicated.
Updates Differences Between 90.1-2007 and 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by John Krutko on
Does anyone have a link to a concise list of the differences between 90.1-2007 and 90.1-2010?
CO Sensors in Multi-Family Highrise
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.
No green cleaning products available?
EBOM-v4 EQp3:Green cleaning policyposted by Andres Schwarz on
My question is if it is required to actually buy certified cleaning products for the prerequisite in order to demonstrate compliance.
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Antje Holdefleiss on
Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Alternative Path for the Optimize Energry Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
We are a brand new dairy located in Ohio. We were constructed in 2014 and went online in 2015. In 2014 there were only 3 new dairies built.
Lighting Power Density at Data Halls
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Anthea Ng on
Hello, May I seek anyone's advice on how to determine the lighting power density for data hall while there is no criteria in ASHRAE 90.1? I have ever heard of 0.8 W/ sf (treating similar to activ
material streams
CI-v4 MRc6:Construction and demolition waste managementposted by Sean Quinn on
We are working on a project where there is not enough room for on-site separation, and the commingled waste will be picked up by the sorting facility.
Reporting and metering frequency
NC-v4 WEc4:Water meteringposted by Lorne Mlotek on
In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi