Forum quick links
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Qualifications for ID+C rating system
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Mercedes Ferreira on
Does the project building need to be a rented space in order for it to fall under the ID+C rating system?
Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
energy used on-site vs sold energy
NC-v4 EAc5:Renewable energy productionposted by LEEDme Lorenzi on
I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.
Alley
ND-Plan-v4 NPDp1:Walkable streetsposted by Martine Desbois on
Is there a definition for what constitute an alley? I cannot find one in the Reference Guide. Thank you
Space control requirement sales area
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
There is a mandatory requirement to instal a space control that will have at least one control step (between 30 and 70%) for each space.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
SCS not yet approved?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
SCS certified EPDs are not yet approved?
Primer for Waterproofing membrane
NC-v4 EQc2:Low-emitting materialsposted by Leanne Conrad on
In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a
Credit Points
Healthcare-v4 IPc1:Integrative processposted by Christine Chow on
The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?