Definition of "Functional Entry"
NC-v4 LTc6:Bicycle facilitiesposted by Marion THIBAULT on
Dear all LEED user,
MEPC input - Total cooling & heating capacity
CS-v4 EAc2:Optimize energy performanceposted by Lenka Matějíčková on
Hi to All,
I would like to clarify the MEPC calculator inputs for LEEDv4 under C&S.
In the Air-Side HVAC tab:
1/ Cooling & heating capacities:
Modeling baseline DES under Option 1, Path 2 - full DES performance accounting
CS-v4 EAc2:Optimize energy performanceposted by Lenka Matějíčková on
Hi All,
We are modeling an industrial plant including the plant DES system, pursuing the Option 1, Path 2. Full DES Performance Accounting.
PV panels on Roof
CS-v4 SSc5:Heat island reductionposted by Andrea Tirao on
Hi, Our project has parking on basement, GF+1F office spaces, then roof is covered almost entirely of PV panels.
50% Unbound
Healthcare-v4 SSc5:Heat island reductionposted by Lene Hill on
What does unbound mean? How is unbound determined?
WE Indoor water use reduction - Detention facility requirements
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Rennell on
We are currently working on 2 small detention facilities (25 beds and 60 beds). Both projects are new construction and are not Retail, school, or hospitality projects.
SR for White Cement Concrete Pavement
NC-v4 SSc5:Heat island reductionposted by Osman Faroq on
Dear LEED Users,
Designing Baseline with Natural Ventilation using IDA-ICE
NC-v4 EAp2:Minimum energy performanceposted by Azra on
Hi,