Forum quick links
IN- GREEN BUILDING EDUCATION
CS-v4 INc1:Innovationposted by Dulce Solis on
Has anyone implemented the second strategy in the guide "The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project."?
Outdoor air in the Baseline Model
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the s
High Priority Site - Priority Destination for projects outside U.S.
CS-v4 LTc3:High priority siteposted by Sajna Cherur Nathankoden on
Hi,
What are the examples for Priority Destination for projects outside U.S.?
Does a "Hot Zone" in a Fire Station need individual door closers?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito
Would a fire sprinkler system count as "other process water"
NC-v4 WEc4:Water meteringposted by Cindy Quinn on
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"?
TIA!
Number of eligible Innovation credits from Pilot Credits
NC-v4 INc1:Innovationposted by Jason Garvens on
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits?
EAc2 Optimize Energy Performance: Baseline Building Heating Source
NC-v4 EAc2:Optimize energy performanceposted by Ricardo Sá on
Wind PPA OR PV garden question
NC-v4 EAc5:Renewable energy productionposted by Kyu-min Lee on
Hello,LEEDuser!!!!
My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?
NC-v4 MRp2:Construction and demolition waste management planningposted by Olga Yuil on
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.
can I get point with double contraction ??
NC-v4 EAc4:Demand responseposted by Kyu-min Lee on
Hi,
While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as demand response.