Forum quick links
Project Boundary - Excluding ceiling work for HVAC and plumbing connections
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Tracy Marquis on
We are renovating spaces on the ground floor of an academic building. The primary renovation spaces are contiguous, however, there will be minor work in the ceilings, outside of the LEED boun
Which building type does data centre belong?
CI-v4 LTc5:Reduced parking footprintposted by Ameet AA on
There's no such a building type as data centre in the base ratio table, I was wondering if it should be "data processing, telemarketing", or "general light industrial, industrial park, and manufact
Changes in the LEED v4.1 BD+C draft to the Option 4 WBLCA - positive, overall
NC-v4 MRc1:Building life-cycle impact reductionposted by Panu Pasanen on
As most will have noted, the language for the v4.1 BD+C draft came out just before holidays.
Green electricity
CS-v4 EAc7:Green power and carbon offsetsposted by Guillaume Rose on
Hi,
I work on a 100% electric project.
1 big LEED project or a group of a dozen little ones?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Susan Di Giulio on
So let's say you have a big, multilevel car rental facility. The vast majority of the building is unconditioned car storage. Not parking. Rental car storage.
Phase 1 and 2 Assessment Clear, Then Contamination Found
NC-v4 LTc3:High priority siteposted by Jason Burtwistle on
Hi all,
Built In Cabinetry - Custom Millwork
CI-v4 EQc2:Low emitting materialsposted by Summer Minchew on
Looking for some guidance on how to define built in cabinetry for LEED v4 Low-Emitting Materials.
Greenscreen
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Bill Freeman on
Can you tell me how many ingredients in building products have completed the Greenscreen analysis process and where a list of these reports can be found which would include the Benchmark assigned a