Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Wire safety glazing (existing) considered a fritt/pattern?

NC-v4 EQc8:Quality views
posted by  Marlene Borruso  on 

We are working on a major renovation to a historic structure that retains the old school wired glass (with new clear  storm windows).

0

Can EV charging stations be the FEV parking spaces?

NC-v4 LTc8:Green vehicles
posted by  Chris Flint Chatto  on 

Can EV parking spots be the FEV spaces as well?  I have a project with relatively few (26) parking spots (for the size of the project) and the owner wants the vast amount (21), for building ex

2
Thu Apr 18, 2019, 12:01 am

Barriers in implementing material transparency in LEED v4 projects

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  SUSAN THOMAS  on 

I am a master's student at State University of New York College of Environmental Science and Forestry doing my thesis in Barriers in implementing material transparency in LEED v4 projects.

0

Shading by fixed construction elements - take into account for the baseline model?

NC-v4 EAc2:Optimize energy performance
posted by  Sarah Leenknegt  on 

Hi

Summary from Appendix G:

- self-shading is not allowed to be modeled in the baseline

- manual shading devices are not required to be modeled in the baseline

1
Tue Apr 16, 2019, 4:12 pm

Material costs necessary?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Tommy Linstroth  on 

For EPD Option 1 or MIR Option 1, it would seem you can just submit 20+ products with EPDs and not have to provide any material cost data whatsoever in the BPDO calculator, since the cost calculati

6
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Tue Apr 16, 2019, 1:07 pm

Phased Cx for a phased project

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Doo  on 

We are working on a comprehensive renovation and addition of an Art Center at an independent high school.

1
Sun Aug 11, 2019, 10:13 pm

Only commuter rail frequency complies with requirements

NC-v4 LTc5:Access to quality transit
posted by  Ricardo Sá  on 

Dear All

we are evaluating the possibility of certifying a distributrion center.

In what related LT C5 (“Access to Quality Transit”):

0
4
Default Avatar
Sustainability Specialist
Hord Coplan Macht
LEEDuser Basic Member
5 thumbs up
Mon Apr 15, 2019, 4:18 pm