Forum quick links
minor improvements within the water body body buffers: grade changes necessary to ensure public access
NC-v4 LTc2:Sensitive land protectionposted by Louise Schlatter on
Hi. I have a question about minor improvements within the water body body buffer. It says "grade changes necessary to ensure public access." We have a small First Order strea
FSC wood
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Hoda Ibrahim on
Can I use imported FSC wood as raw material and locally manufactured or FSC shall be locally harvested ?
Option 1 - Flushout of Non-Occupied Spaces
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Bahr on
My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?
Locally Sourced materials definition
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Elizabeth Kertesz on
The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost.
MERV 11 in garage unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Johanna Koch on
Do you have to have MERV 11 filters installed in the ventilation unit that is connected to a garage?
not unreasonably exclude space... must distinguish from any non-certifying space... Complete building or space MPR in disguise?
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ward Miller on
Maria & Merve - great questions!
LVR wood stain and concrete sealer
CI-v4 EQc6:Interior lightingposted by Sue Bryant on
How do you find the LVR for these products?
Waste Management Coordinator
NC-v4 MRp2:Construction and demolition waste management planningposted by Akshay Padwal on
The person (program manager) who is coordinating waste management, do they have to be LEED certified?
Requirements for "Ongoing Feedback Mechanism"?
CI-v4 IPc1:Integrative processposted by Renee Shirey on
The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,