Forum quick links
Does a Data Hall should be modeled with an Air Economizer in Baseline
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Unregulated loads in production plant
NC-v4 EAc2:Optimize energy performanceposted by Julio Fernandez Amodia on
Hi to all,
Regd. Peak Cooling Load in Baseline Model for Chiller Sizing
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
I have a general doubt regarding peak cooling load which is to be taken in baseline case for sizing the chillers. We generally model the base case for any building in Design Builder.
Pilot Comprehensive Composting sspc 129
CI-v4 INc1:Innovationposted by Laurie Johnson on
I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing. The client has chosen to work with the company CompostNow as there is no
Baseline Building Information not availiable
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on LEED ID+C project in which we do not have any info regarding COP of chiller, Fan Flow, Fan power, Pump power etc. So what should I do to input that?
Water Metering for LEED Group: Single Meter for 3 Buildings?
NC-v4 WEp3:Building-level water meteringposted by Mike Refsland on
I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group.
IN - Heat Island Mitigation with Cool Walls
CS-v4 INc1:Innovationposted by Benjamín Nieto on
Hello everyone!
Heat Island Mitigation with Cool Walls
NC-v4 INc1:Innovationposted by Nohemi Mena on
Hello everyone!