Forum quick links
Pool area within natatoriums excluded?
NC-v4 EQc8:Quality viewsposted by Lyle Axelarris on
Does anyone know if pool decks and splash pad areas in an Aquatics Facility are exempted from this credit (similar to the exemption for gyms)?
Natural ventilation room by room calculation
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Agustin Bertolotti on
Hi everyone
Roadways materials
NC-v4 SSc4:Rainwater managementposted by Dina El-Sady on
Which would be better for this credit , a normal porous asphalt paving or a vegetated interlock ?
EQp2
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Alice Andersen on
Hi LEEDuser
I have two questions:
Anti-Ligature Plumbing Fixtures
Healthcare-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Hello, has anyone had an success getting an exemption or exclusion on the WaterSense requirements for anti-liguature fixtures in an in-patient mental health facility?
Zone Isolation in Hotels
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
SS Environmental Site Assessment (Prerequisite) - Phase I ESA
Healthcare-v4 SSp2:Environmental site assessmentposted by Jeff Frederick on
The LEED V4 Reference Guide states that "If a Phase I ESA is more than one year old, a new assessment is required". At what moment is the duration since the previous ESA measured?
Purchase green power contract for core and shell
CS-v4 EAc7:Green power and carbon offsetsposted by Vincenzo Giacalone Biondo on
Hello everyone,