Radon mitigation in High-Rise Mixed-Use project
NC-v4 EQp1:Minimum indoor air quality performanceposted by GANESH NAYAK on
A high-rise mixed-use project with two levels of office and multiple levels of residential is in EPA Zone 1 for radon.
bus rapid transit stop
NC-v4 LTc6:Bicycle facilitiesposted by Erin Holdenried on
what is the definition of a bus rapid transit stop? Can a bus transfer station count towards this? or Greyhound station? I have a project that can meet all the criteria except this one.
Lowest flow shower on the market
NC-v4 WEp2:Indoor water use reductionposted by Sophie Kerr on
What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM).
Are CO sensors needed for lodging units with no kitchen facilities
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alokmay Behera on
There is a labor accomodation project with the no cooking facilities whatsoever. There will be centralised kitchen facility for the project. Do we still need to have CO sensors one per unit?
Question about "required ventilation air" in G3.1.2.9.1 for laboratory spaces
NC-v4 EAp2:Minimum energy performanceposted by CT G on
We're seeking clarification on how other users interpret the term "required ventilation air" in the exception to Section G3.1.2.9.1 of Appendix G (ASHRAE 90.1-2010) for laboratory spaces.
Building Envelope Commissioning
NC-v4 EAc1:Enhanced commissioningposted by Chris Bennett on
Hello All,
Heat Island Mitigation with Cool Walls
CS-v4 INc1:Innovationposted by Dulce Solis on
We are working on a LEED project in a warm climate where daily temperatures are high for most of the year.
Pilot Question Surveys
NC-v4 INc1:Innovationposted by Theresa Lehman on