Pilot-Credits PC14:Walkable Streetsposted by Mike Stopka on
Submitting the following: 1. Continuous sidewalks. 2. Main entrance on the primary façade faces a public space. 3.
Multiple Street Frontages
Pilot-Credits PC14:Walkable Streetsposted by Carrie Webster on
Our project is on a corner and has two street frontages, with the primary façade on the "main street" and one side along a side street.
Future Alternative Compliance Paths
Pilot-Credits PC14:Walkable Streetsposted by Douglas Flandro on
I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar
SSpc14 Walkable project Site
Pilot-Credits PC14:Walkable Streetsposted by R Jones on
I have recently applied this criteria to a Major Refurbishment project in an Urban setting. Has anyone looked at using this pilot credit for a Commercial interiors project?
PC14 closed?
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
As stated by Melissa Merryweather below the link to the survey is broken.
SSpc14 - Walkable project site
Pilot-Credits PC14:Walkable Streetsposted by Robert Cannellos on
I have a project in Miami that meets all the criteria of the SSpc14 credit, however I have a question to define the following requirement - "When a Façade extends along a sidewalk – no more than
Participant Survey
Pilot-Credits PC14:Walkable Streetsposted by Bryan Finnegan on
The link provided to us for the Pilot Credit Participant Survey only directs to the USGBC homepage. Is there an up to date link for this?
Facades Extending Sidewalks
Pilot-Credits PC14:Walkable Streetsposted by ray keane on
For the following requirement: - If a facade extends along a sidewalk, no more than 40% of its length or 50 feet, whichever is less, is blank (without doors or windows). Is the requirement met if
Building Height Requirements
Pilot-Credits PC14:Walkable Streetsposted by Shannon Barras on
I agree with Andrew about the building height requirements for this credit. It is the one area that may need to be looked at further.
Street frontage and an urban setting
Pilot-Credits PC14:Walkable Streetsposted by Renee Shirey on
Has anybody had success with this credit on a project in an urban setting? What about approaching it with an 'Alternative Compliance" path?