Forum quick links
Views for Medical Exam Rooms
NC-v4 EQc8:Quality viewsposted by Kyle Ritchie on
Our project is pursuing LEED v4 BD+C certification and is a University building.
Unfinished Tenant Spaces
NC-v4 EQc8:Quality viewsposted by James Keohane on
Working on a NC v4 project that has unfinished spaces with no ceilings or HVAC. The exterior glazing and building envelop is complete. To put this into perspective about 85% of the
View Type 2 - Exterior Views as Floor Elevation Changes
NC-v4 EQc8:Quality viewsposted by Laura Charlier on
I'm working on highrise hotel and office space. Is there some sort of rule-of-thumb to consider as the floor elevation changes?
Typo in View Factor Chart
NC-v4 EQc8:Quality viewsposted by Chris Edmonds on
In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".
Visible Light Transmittance
NC-v4 EQc8:Quality viewsposted by Max Krueger on
Will specing a low (40%>) VLT in vision glazing as a glare control measure affect this credit?
Thanks.
Strategy to fulfill the pilot credit Quality views in non regularly occupied spaces
NC-v4 EQc8:Quality viewsposted by Angela Atehortua on
In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all space
Long ribbon window considered for View Type 1
NC-v4 EQc8:Quality viewsposted by Khue Nguyen on
Out project has multiple ribbon windows along the entire perimeter walls. Is this condition eligible for View type 1?
View type 1 & 2 with interior permanent obstructions
NC-v4 EQc8:Quality viewsposted by Khue Nguyen on
My project is an office building with workstation along continuous ribbon windows looking out to landscape. I understand that this work space is not qualified for View type 3.