Post a question or comment
Credit Filters
Daylight
Filter by location
Forum
Topic
Replies
Recent

Auditorium; lower illuminance level

NC-v4 EQc7:Daylight
posted by  Jody Lee Potvin-Jones  on 

Dear LEED forum In LEEDv4 NC it is stated in the reference manual (p735) that "Auditoriums must be included in the daylight requirements, but a lower illuminance level is acceptable; see recommend

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 13, 2025, 2:38 am

Recommened software for doing the Interior and Daylighting analyses.

NC-v4 EQc7:Daylight
posted by  Jorng-ren Chern  on 

We’re in search for a suitable software to do the Interior and daylighting analyses for LEED V4.

15
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Dec 18, 2024, 9:27 pm

Office kitchen to be considered as regularly occupied space for Daylight Analysis

NC-v4 EQc7:Daylight
posted by  Rajat Kumar  on 

We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don

0

Regularly occupied area of an hotel room

NC-v4 EQc7:Daylight
posted by  Ilse Dijkstra-Nugteren  on 

Should the entrance area of a hotel room (small area (

4
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Mon May 13, 2024, 3:38 pm

LEED Daylight Simulation Option1 with IES-VE

NC-v4 EQc7:Daylight
posted by  Mahshid Sedighimoghaddam  on 

Hello everyone,

We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1.

0

Glare control devices for residential projects

NC-v4 EQc7:Daylight
posted by  Sana Hafsa  on 

I have a residential project aiming for certification under LEED v4 NC BD+C (the buildings are over 8 floors).

1
Thu Oct 9, 2025, 5:48 pm
2
Fri Jan 20, 2023, 4:09 am

Glare control devices on interior glazing

NC-v4 EQc7:Daylight
posted by  Elise Woestyn  on 

Are glare control devices required only on exterior glazing?

3
Thu Feb 10, 2022, 7:03 pm

DAYLIT AREA Op-2

NC-v4 EQc7:Daylight
posted by  Ale g  on 

Hi to All Experts,

some opertaive clarifications will be really appreciate: pursuing the credit through option 2

6
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu May 6, 2021, 3:05 pm