Post a question or comment
Credit Filters
Minimum indoor air quality performance
Filter by location
Forum
Topic
Replies
Recent

Demand Controlled Ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Nancy Henderson  on 

We have demand controlled ventilation in spaces with varying occupancy.  The building is a YMCA.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Dec 16, 2020, 10:19 pm

Dedicated Kitchen Exhaust

NC-v4 EQp1:Minimum indoor air quality performance
posted by  colleen soden  on 

We have a low rise (4 story) multifamily residential project considering LEED v4 BD+C in Boston.

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Nov 11, 2020, 10:59 am

Mixed Model, Mechnical ventilation design

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Sandra Lee  on 

Hello all: I am a newbie here so may this question was brought up. We have a building with a canteen for workers. 

0
1
Wed Feb 10, 2021, 11:39 am

Radon resistant construction for first 4 stories above grade.

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Sue Bryant  on 
  • Requirement: Construct any dwelling unit on levels one through four above grade with radon-resistant construction techniques.

0

CLASS 1 AIR SEPERATION DISTANCES_62.1 2010

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Fotis Kotsopoulos  on 

In case of a central AHU mounted on roof level supplying 100% (incl. run around coil) fresh air to office spaces:

0

Indoor Air Quality Procedure

NC-v4 EQp1:Minimum indoor air quality performance
posted by  James Keohane  on 

I understand that the credit language requires the use of the Ventilation Rate Procedure(VRP) from ASHRAE 62.1-2010.

2
Mon Aug 10, 2020, 10:04 pm

Supply and Return Fan Tracking OA compliance

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Mike oliva  on 

I feel like I've seen this discussed before on here but I'm not finding it at the moment.  We're wondering if a VAV system serving multiple spaces can use AFMS at fan inlet bell for supply and

1
Fri Nov 12, 2021, 4:03 am
3
Default Avatar
ESD Engineer
GreenViet Consultancy Company
LEEDuser Basic Member
3 thumbs up
Thu Jul 2, 2020, 1:57 pm

Monitoring Equipment suitable?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dang Thi  on 

Our project have 1 PAU supply fresh air to many plenum of FCU (return air + fresh air), beside that we also have some meeting room which fresh air is supply through VAV box, control by CO2 sen

2
Default Avatar
ESD Engineer
GreenViet Consultancy Company
LEEDuser Basic Member
3 thumbs up
Sat Jun 27, 2020, 9:58 pm