Reuse of laboratory equipment and furniture

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Isabel Santos  on 

Dear all, We are assessing a renovation project according to LEED v4.

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Aug 25, 2016, 10:21 am

LCA and EPDs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  NESLIHAN AKSOY  on 

Buildings LCA is conducted to measure the impact of building materials..as well as building use etc.

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Fri Aug 5, 2016, 12:42 pm

Recycled Content Criteria?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brad McAllister  on 

Option 2 states: Recycled content. Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on cost.

3
Thu Feb 25, 2016, 8:02 pm

High Recycled Content

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  barbara anderson  on 

In the past 6 months we have noticed that a high recycled content of 70% or more has been required on acoustic ceiling tile.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 25, 2016, 7:43 pm

CSR- GRI Report

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  LEED Pro Consultant  on 

I have a question regarding option 1. The GRI report for a product does not address the raw material supplier extraction location.

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Mon Jan 4, 2016, 3:05 pm

Calculating Materials vs. Construction vs. Project costs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jessica McNaughton  on 

The default materials calculation is 45% of construction costs (Div 3-10 primarily). Is there a generally accepted percentage of project costs that is considered to be construction costs?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Mar 18, 2015, 8:49 pm

FSC Language in LEED V4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Dori Hauser  on 

The alternative documentation process for FSC as described in V4 on page 534 is confusing: The issues in particular are: - The woodworker must install the product.

3
Default Avatar
Preconstruction Manager
ISEC, Inc.
LEEDuser Basic Member
0 thumbs up
Wed Mar 18, 2015, 7:20 pm

Location Valuation Factor Question

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Lorne Mlotek  on 

The reference guide states that, "Products and materials that do not meet the location radius but do meet at least one of the sustainability criteria are valued 100% of their cost (i.e., the valuat

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 9, 2014, 7:30 pm