Building and Material Reuse

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

I'm selecting Option 3 for building and material reuse.

1
Sat Aug 26, 2017, 12:04 pm

Specifying metal with high recycled content?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Juliana Moreira  on 

Hi, this is less of a question but rather food for thought and feedback that could (should) be used for future addenda to LEED version 4: Many metals can be manufactured either from ore plus scrap

0

LCA Part C – End of Life

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Petr Vogel  on 

The credit says cradle to grave so it is obvious that this part has to be included. Is there any guidance how should it be included?

0

Innovation point for NCv3?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Erica Downs  on 

Any idea if this credit could be followed for an innovation point under v3? We are reusing an historic church, with an addition.

1
Wed Nov 11, 2015, 4:11 pm

LCA calculation

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Emmanuel Pauwels  on 

1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD.

1
Mon Mar 27, 2017, 1:21 pm

LCA Part B – Use stage of 60 years

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Petr Vogel  on 

Since B stage is compulsory to be included I would like to ask similarly how deep should we dig in. Having in mind the following: B1-B3 – Bearing in mind all MEP is out of the assessment.

0

Toolkits for v4

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Linda Deatrick  on 

When will the toolkits with templates be on-line?

1
Fri Mar 7, 2014, 4:08 pm

Re-using existing building as outdoor amphitheater

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Jeff Denno  on 

Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th

1
Sat Aug 26, 2017, 12:01 pm

LCA Software applicable for Macau, China

NC-v4 MRc1:Building life-cycle impact reduction
posted by  ruffina thilakaratne  on 

is there any LCA software that can be used in Macau, China? Macau is part of PRC (China) administration), but not geographically located within China, closer to Hong Kong.

3
Wed Aug 9, 2017, 9:45 am

Greenbuild education session on LCA for LEED v4 on Friday 7th

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Panu Pasanen  on 

For those headed to LA Greenbuild and minded to get bit more solid understanding of use and requirements of LCA in LEED context, I'll be co-presenting an education session.

2
Green building coordinator
CIMA+
LEEDuser Basic Member
0 thumbs up