Forum quick links
Wind-PPA as renewable energy production?
NC-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met. 1)The project owns the
LEED Zero
NC-v4 EAc5:Renewable energy productionposted by Vassil Vassilev on
Greetings,
Regarding Renewable Energy Production for LEED certification and also for LEED Zero certification, there is an issue which is kind of not clear to me.
Renewable Energy Calculation (Energy vs Costs)
NC-v4 EAc5:Renewable energy productionposted by Michael Tsang on
Hi Everyone,
Total Estimated Building Annual Energy Cost
NC-v4 EAc5:Renewable energy productionposted by Alex Chapin on
Is this calculated as the gross energy cost (i.e. without reducing energy cost with the renewable energy offset) or the net energy cost?
Sewer line heat recovery as a renewable resource?
NC-v4 EAc5:Renewable energy productionposted by Jennifer Szekely on
We have a large sewer interceptor runnning through our site and are looking to tap into that heast source for district space conditioning.
Using BIOMASS Fuel to create steam, service production
NC-v4 EAc5:Renewable energy productionposted by Dang Thi on
We have a case for our project, the production need steam so they use boiler, but the fuel is biomass (sugarcane bagasse, rice husk, rice straw, coconut shell, peanut shell, agric
Borrowing credit from Homes Design and Cronstruction
NC-v4 EAc5:Renewable energy productionposted by Michael J Turner on
Hello,
We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design.
pursuing Renewable Energy and Green Power with the v4.1 credit substitution path
NC-v4 EAc5:Renewable energy productionposted by Cindy Quinn on
I am working on a v4 project that is about to submit for final construction review. We must reach Gold and are right on the threshold, going in with 62 points, if all are earned. We don
Renewable energy production DES Path 1
NC-v4 EAc5:Renewable energy productionposted by Lisa Loreti on
We are modeling a building connected to a DES and we decided to follow Option1 - Path1 for energy modelling.