Forum quick links
Humidity controls in baseline model
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
Air Economizer laboratory
NC-v4 EAp2:Minimum energy performanceposted by Abdulrahman Alshbeeb on
We have a laboratory with very high indoor air requirements. Due to the high demands on the quality of the room air, no air may be circulated.
Baseline system in ASHRAE 90.1 G3.1.1
NC-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
I have a question in the process of creating a baseline system in our modelling.
Our project is in System8.
Modeling System 5 per floor
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a building with baseline system as 5 now based on Table G 3.1.1 , it says we need to model 1 VAV system per floor, now In reality I have 4 VRF units per floor , should I model one
Renewable Energy Production
NC-v4 EAp2:Minimum energy performanceposted by Piotr Adamczyk on
Dear All,
Baseline Model for Data center Economizer
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Schedule for Data Center Load
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?
AHSRAE 90.1, G3 Modeling Question - External Louvers/Shades
NC-v4 EAp2:Minimum energy performanceposted by Brian Salazar on
Hello! Our team is researching opportunities to reduce SHG loads on an 8-story new construction university residence hall.
In what case we don't have to run a baseline model with all 4 rotation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a LEED Data center model with majority of space as vault, now I know for an existing building we dont need to rotate but for a data center do we need to rotate as the majority
Default EIA rates for India
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi! I'm working on a project in India. We cant obtain the utilities rates so we were trying to use the deafault EIA rates like other projects we did in the US.