City Potable Water Analysis Reports
NC-v4 WEc3:Cooling tower water useposted by Saif Abdulameer on
Can I use the potable water analysis reports from the city utility to calculate the cycles?
100% nonportable water for cooling tower
NC-v4 WEc3:Cooling tower water useposted by Thomas Tran on
Hi,
LEED reference document says in the Required document Table (page 309):
Water Analysis - (Maximum concentration exceed 10)
NC-v4 WEc3:Cooling tower water useposted by Osman Faroq on
Dear All,
Hybrid recooler
NC-v4 WEc3:Cooling tower water useposted by Florian Schmidtchen on
Dear all, Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH.
Using Dry cooling tower
NC-v4 WEc3:Cooling tower water useposted by Michael on
My factory project doesn't use regular Cooling towers, they use Dry coolers (dry cooling towers), which don't use water at all. Can we claim to achieve this credit by no using make-up water?
Cooling Tower is used for process water ( Factory project )
NC-v4 WEc3:Cooling tower water useposted by Youssef Hisham on
We are in a factory project and the cooling tower is used for the process water for the factory equipment. So, Does the cooling tower credit requirement applies to our project ?
No cooling tower - ACP
NC-v4 WEc3:Cooling tower water useposted by Charalampos Giannikopoulos on
Hi all!
Master Site: Substitution credit from LEED v4 to LEED v4.1
NC-v4 WEc3:Cooling tower water useposted by Mario Angelo Pinoli on
Hi everyone,
we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version.
Who can supply Potable water analysis results?
NC-v4 WEc3:Cooling tower water useposted by Alex Edwards on
Hello,
Missing parameters in water analysis - urgent query
NC-v4 WEc3:Cooling tower water useposted by Nermin Hegazy on
Hello all!