Manage Runoff from Entire Site Requirement
NC-v4 SSc4:Rainwater managementposted by Karina Lairet on
Per the USGBC Guide, it says that the project must manage rainwater runoff from the entire site within the project boundary.
Rainwater Events Calculator v4
NC-v4 SSc4:Rainwater managementposted by Carmen Mielecke on
Dear all, my 2 question refer to the rainfall events calculator. 1) the percentil is calculated on the historical data sheet. The amount is expressed in mm.
Treatment Requirements
NC-v4 SSc4:Rainwater managementposted by Annie Levan on
Hello,
Can someone please clarify the treatment requirements for various storm water strategies? A few example strategies are as followed:
Floor area Ratio (FAR) calculation for Zero Lot Line Projects
NC-v4 SSc4:Rainwater managementposted by Andrea Costa on
Dear all,
Please, could someone explain me in further detail how to proceed with the FAR calculation?
Rainwater management for large industrial site
NC-v4 SSc4:Rainwater managementposted by Erin Holdenried on
Hello - We have a large industrial site that is using a pond to manage about 25% of the rainwater and a vegetated channel to manage about 75% of the rainwater. I believe the vegetated channel
Rainfall events to consider under Option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi,
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.
Management of on site runoff at a neighboring retention pond
NC-v4 SSc4:Rainwater managementposted by Jason Garvens on
I'm working on a project being built in a designated industrial park area.
Storm water from neighboring site
NC-v4 SSc4:Rainwater managementposted by Bradley Magnusson on
The project I am working on is in a campus setting and the neighboring site's excess runoff is discharged into a storm drain pipe that runs through our project's