Electric Rates

Schools-2009 EAc1:Optimize Energy Performance
posted by  Laura Long  on 

The electric company for our school project offers a rate structure which includes a lower rate for heat pumps.

1
Thu Mar 17, 2011, 8:47 pm

EAC1 Existing Building Renovation Baseline Rotations Required?

Schools-2009 EAc1:Optimize Energy Performance
posted by  Matt Humphreys  on 

Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and exterior

1
Thu Jan 24, 2013, 8:41 pm

LEED for Schools 2007 EAc1 and LEED Boundary

Schools-2009 EAc1:Optimize Energy Performance
posted by  Greg Hackett  on 

Our project contains a new LEED Building (addition) and Non-LEED Building (Existing, not in LEED Boundary).

1
Fri Mar 11, 2011, 7:53 pm
1
Thu Jan 20, 2011, 2:24 pm

EA Cr-1 - Process Energy Cost less than 25%

Schools-2009 EAc1:Optimize Energy Performance
posted by  April McGee-Flournoy  on 

Project K-12 school, The enegry calculation done for the entire building but the process enegry cost comes less than 25%.

1
Fri Aug 12, 2011, 3:38 pm

SSc8 and EAc1 Disconnect?

Schools-2009 EAc1:Optimize Energy Performance
posted by  Amalia Hicks  on 

For LEED v3 (2009) SSc8 - Light Pollution Reduction, the baseline exterior lighting power allowance uses ASHRAE 90.1-2007 Addendum i (which has similar values to 90.1-2010).

1
Tue Jun 3, 2014, 2:14 pm
1
Sun Aug 29, 2010, 9:51 pm

Heat sensors to control HVAC

Schools-2009 EAc1:Optimize Energy Performance
posted by  Gendel Metlitsky  on 

On May, 26 I was listening to webinar regarding Richardsville NEZ school presented by Joanie Hendricks, Public Relations Coordinator from Warren County PS, Tim Murley Superintendent WCPS, Kenny St

1
Tue Jul 26, 2011, 5:44 pm

Elevators (Lift/Escalators) & LEED EAC1 credit

Schools-2009 EAc1:Optimize Energy Performance
posted by  Ameet AA  on 

Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 16, 2014, 8:11 pm