Forum quick links
Pressure Drop credit for DOAS system in Baseline
Schools-2009 EAp2:Minimum Energy Performanceposted by Manish Khandelwal on
Hi.
EPA Target Finder rating tool
Schools-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
Following requirement is stated even in the LEED 2009 School Alternative compliances path for project outside the U.S.(July 2012) "The project must establish an energy performance rating goal for
Baseline Building Performance
Schools-2009 EAp2:Minimum Energy Performanceposted by Justin Weisser on
In an all-electric building with a Geothermal Bore field and packaged Heat Pumps system, if the project wants to use an Indirect Gas fired Make-Up Air Unit for the Kitchen Exhaust Hood, will we hav
Water-Source Heat Pump part load efficiency
Schools-2009 EAp2:Minimum Energy Performanceposted by eric jendro on
I am using HAP to model a system consisting of water-source heat pumps. I am required to input the ARI/ISO efficiency.
Trane TRACE's 40 plant limit.
Schools-2009 EAp2:Minimum Energy Performanceposted by Kelsey Rightmer on
The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.
Proper way to apply ASHRAE 62.1 to baseline model?
Schools-2009 EAp2:Minimum Energy Performanceposted by Joseph Lewis on
I have a project where the proposed design has demand controled ventilation.
Square Footage Discrepancy
Schools-2009 EAp2:Minimum Energy Performanceposted by Michael Kros on
Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model