Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

EPA Target Finder rating tool

Schools-2009 EAp2:Minimum Energy Performance
posted by  Ameet AA  on 

Following requirement is stated even in the LEED 2009 School Alternative compliances path for project outside the U.S.(July 2012) "The project must establish an energy performance rating goal for

1
Mon Dec 3, 2012, 5:17 pm
1
Fri Jan 7, 2011, 10:22 pm

Baseline Building Performance

Schools-2009 EAp2:Minimum Energy Performance
posted by  Justin Weisser  on 

In an all-electric building with a Geothermal Bore field and packaged Heat Pumps system, if the project wants to use an Indirect Gas fired Make-Up Air Unit for the Kitchen Exhaust Hood, will we hav

1
Thu Jun 19, 2014, 6:37 pm

Water-Source Heat Pump part load efficiency

Schools-2009 EAp2:Minimum Energy Performance
posted by  eric jendro  on 

I am using HAP to model a system consisting of water-source heat pumps. I am required to input the ARI/ISO efficiency.

1
Fri Mar 9, 2012, 2:47 pm

Trane TRACE's 40 plant limit.

Schools-2009 EAp2:Minimum Energy Performance
posted by  Kelsey Rightmer  on 

The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.

1
Tue Jul 19, 2016, 4:32 pm
1
Tue Aug 10, 2010, 12:23 am

Proper way to apply ASHRAE 62.1 to baseline model?

Schools-2009 EAp2:Minimum Energy Performance
posted by  Joseph Lewis  on 

I have a project where the proposed design has demand controled ventilation.

1
Wed Dec 4, 2013, 1:14 pm

Square Footage Discrepancy

Schools-2009 EAp2:Minimum Energy Performance
posted by  Michael Kros  on 

Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model

1
Mon Mar 5, 2012, 11:03 pm