Hi.

We are doing a school building Energy modelling. In this school building we used FCU+ DOAS system. DOAS unit has (1) merv 13 for both OA and EA (2) DOAS has ER device and heat pipes.

In baseline, I created five systems, three are System 5 and two of them are system 3. 

(1)Per ASHRAE 90.1 2007, I dont need Energy recovery device in the baseline. So can I take PDC for Energy recovery device and Heat pipe for ventilation air?

Or I can take PDC for Energy recovery device and heat pipes only when I have ERV in the baseline.

(2) If I can take PDC then okay but if I cant then is there any way to consider this PD in baseline?

Manish,