Forum quick links
LEED EBOM WEc1: Water Performance Measurement denied in Core & S
CS-2009 IDc1:Innovation in Designposted by Adriana Hansen on
We are proposing to install equipment for measuring the consumption of irrigation water, toilets and cooling towers.
EQ PC 57 - French feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env
energy-saving target during construction
CS-2009 IDc1:Innovation in Designposted by Dee Yun on
Hi, I have a project that has energy-saving target during the construction phase.
EBOM WEc4 Cooling Tower Water Management as C&Sv2009 ID Credit
CS-2009 IDc1:Innovation in Designposted by Liz Voeller on
The LEED Project Submittal Tips guide for C&S from GBCI (published 12/23/2011) states that EBOM WEc4.1 Cooling Tower Water Management is allowed in BD&C v2009 as an ID credit.
Innovation in Design Path 1 & Exemplary Performance Path 2
CS-2009 IDc1:Innovation in Designposted by Maggie Hogan Skaug on
1) It is my understanding that a project may pursue BOTH Path 1 and Path 2 to attempt up to 5 credits in this category.
Green Educational Program Format
CS-2009 IDc1:Innovation in Designposted by Flavia Marques on
Hi We have registered a project under LEED CSv2009 and are targeting the ID Credit - Green Educational Program. One of the component is the building case study.
EA Cre 3 - Exemplary performance
CS-2009 IDc1:Innovation in Designposted by Adam Targowski on
I would like to make sure of one thing.
SS PC27 - a short feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim
Innovation through lease agreement
CS-2009 IDc1:Innovation in Designposted by Mike D on
Can an innovation credit be achieved through a tenant lease agreement which will require all tenants to install low-emitting materials for their space.
photocatalytic paint (TiO2) on Carpark Wall and Ceiling
CS-2009 IDc1:Innovation in Designposted by Wing Ho on
Our client is considering to apply photocatalytic paint (TiO2) on the project carpark wall and ceiling to reduce the NOx level and air pollutant.