Forum quick links
green cleaning
CS-2009 IDc1:Innovation in designposted by Alfonzo Collins on
Realizing I should have posted this here...I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease,
LEED CS ID Path 1 - Legally binding performance criteria
CS-2009 IDc1:Innovation in designposted by Caroline Ma on
In our CS project, we would like to develop a legally binding performance criteria for the tenant to attempt 1 point in ID Path 1.
LEED v2009 CS+ID Point
CS-2009 IDc1:Innovation in designposted by Britt Valdez on
In seeking IDc1 Innovation and Design point for LEED CS v2009, would the purchase of carbon offsets to reduce natural gas emissions be acceptable in achieving the ID point?
Educational Program
CS-2009 IDc1:Innovation in designposted by Morteza Kasmaei on
We are working on a LEED-CS project. Our client asked the architects to add a touch-screen kiosk in the building lobby to inform occupants and visitors about the project's green features.
LEED EBOM WEc1: Water Performance Measurement denied in Core & S
CS-2009 IDc1:Innovation in designposted by Adriana Hansen on
We are proposing to install equipment for measuring the consumption of irrigation water, toilets and cooling towers.
Low Mercury Lamps
CS-2009 IDc1:Innovation in designposted by Sara Greenwood on
Hello, I am working on a v2009 LEED-CS project and was wondering if the Low-Mercury lamp credit could be pursued?
EQ PC 57 - French feedback
CS-2009 IDc1:Innovation in designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env
energy-saving target during construction
CS-2009 IDc1:Innovation in designposted by Dee Yun on
Hi, I have a project that has energy-saving target during the construction phase.
EBOM WEc4 Cooling Tower Water Management as C&Sv2009 ID Credit
CS-2009 IDc1:Innovation in designposted by Liz Voeller on
The LEED Project Submittal Tips guide for C&S from GBCI (published 12/23/2011) states that EBOM WEc4.1 Cooling Tower Water Management is allowed in BD&C v2009 as an ID credit.
Innovation in Design Path 1 & Exemplary Performance Path 2
CS-2009 IDc1:Innovation in designposted by Maggie Hogan Skaug on
1) It is my understanding that a project may pursue BOTH Path 1 and Path 2 to attempt up to 5 credits in this category.