Forum quick links
Invoices
CS-2009 MRc5:Regional Materialsposted by Michael E. Edmonds-Bauer on
I would like to know how we must prove GBCI about materials cost. We are requesting our contractor to provide the following for steel rebars: 1.
MR5
CS-2009 MRc5:Regional Materialsposted by Christine Castellano on
Steel sub listed 76.60% of raw materials extracted within 500 miles of project, the data he provided for back-up lists 5 different locations where the raw material was extracted but manufacturer ca
Core and Shell Scope & Tenant Scope
CS-2009 MRc5:Regional Materialsposted by Osama Hassan on
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.
Does water count for MRc4 and MRc5
CS-2009 MRc5:Regional Materialsposted by Anna Korinkova on
Does water as a part e.g.
MR5
CS-2009 MRc5:Regional Materialsposted by Christine Castellano on
accidentally posted this in MR4 - "this is my first time inputting into LeedOnline - as I cannot find interactive help on that site - I have no idea what to put in the columns where the extraction
BDC Material & Resource Calculator- Percentage Regional
CS-2009 MRc5:Regional Materialsposted by Suha Hyderabad on
I have a question regarding the BDC Material Tracker, % Regional.
LEED Letter template
CS-2009 MRc5:Regional Materialsposted by Steve Salzman on
I am looking for the LEED letter template for CS 2.0 MRc5 (the credit requirements specify that this is necessary in order to capture the credit for the tenant lease/sales option).
Different sources
CS-2009 MRc5:Regional Materialsposted by Mike D on
On one project we are working on, the manufactuer sources iron ore from many countries and he is unable to say what ore was used in any particular batch of steel. How do we determine this?
Length of supply chain
CS-2009 MRc5:Regional Materialsposted by Magnus Stagnäs on
Sometimes the supply chain from the extraction of virgin material to the complete assembly may be very long and difficult to document.