Forum quick links
Core and Shell area and Tenants area
CS-2009 EAc6:Green Powerposted by Vassil Vassilev on
Greetings,
Pursuing EAc6, Option 1, for office building registered as C&S for LEED certification, the following issue is kind of not clear to me:
Project with PV - Calculating Green Power?
CS-2009 EAc6:Green Powerposted by Brian Salazar on
Hello! I am working on a project with on-site PV.
Net Zero Building
CS-2009 EAc6:Green Powerposted by Lisa Marshall on
Hello, my project is going for Net Zero energy consumption and we were planning on going for the EAc6 - Green Power credits.
Green Power -contract / purchase date
CS-2009 EAc6:Green Powerposted by C. Anthony Menefee on
Is it possible for the owner to sign the 2 year contract and begin energy consumption before the building is completed and occupied?
Achieving Green Power in the UK
CS-2009 EAc6:Green Powerposted by Carine Guenand on
Has anyone achieved this credit in the Uk? And do the REC/contract to be in place at the time of handover to the client? The building will not be occupied straight away.
Off-Site Solar Used to Power 100% of Building Electricity
CS-2009 EAc6:Green Powerposted by Heather South on
I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin
Green Power Purchasing
CS-2009 EAc6:Green Powerposted by Jesus Deras on
When purchasing Green Power for commercial interior fit outs/Floor via the SF methodology, do you typically take the area of the entire space(including ac rooms, freight elevators, stairs,electrica
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green Powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Change in Ownership affecting Green Power Contract?
CS-2009 EAc6:Green Powerposted by Joern Drosten on
Dear all, the company which does the site development of our project has entered a two-year power contract (100 % green power).
Wind Energy
CS-2009 EAc6:Green Powerposted by LEED Pro Consultant on
Hi, We are working on a project in Mexico. In order to comply with the credit requirments its valid to purchase electricity directly from a wind farm also in Mexico to get the points?