CS-2009 EAc2:On-site Renewable Energyposted by Emmanuel Pauwels on
We have filed for design submittal and are moving into construction phase. The client decided to integrate PVs in the project.
1% from 15%?
CS-2009 EAc2:On-site Renewable Energyposted by Alicja Bieszyńska on
I'm working on a Core and Shell project and recently I was given the energy model made for us by a consultant.
Feed-in Tariff Program Allowed?
CS-2009 EAc2:On-site Renewable Energyposted by Laura Billings on
I'm representing a building owner/Landlord who is building a new multi-tenant office building and planning a very large solar installation, targeting net zero electricity and LEED-CS Platinum.
Developer Owned On-Site Renewable Energy Sold to Tenants
CS-2009 EAc2:On-site Renewable Energyposted by Mark Frey on
We are working on a LEED CS project where the investor will sell the energy produced on-site by photovoltaic systems to the tenants in the project building, according to internal fees at a premium
Onsite Renewable for 1% of owner controlled annual energy cost.
CS-2009 EAc2:On-site Renewable Energyposted by Dave Hubka on
Hi Marcus, I've recently been asked if we could prorate the "1% renewable" to account for only the owner controlled annual energy consumption cost rather than the total building annual energy cost
Time line for PV installation
CS-2009 EAc2:On-site Renewable Energyposted by Sayeed Muhammad on
In our project we intend to install PV panels for 300KWp capacity. Its a NC2009 project aiming for LEED platinum. The building is office building with a 24hrs cafeteria.
Different commencements of green power contract and biogas CHP
CS-2009 EAc2:On-site Renewable Energyposted by Joern Drosten on
Dear all, our project will get a biogas CHP plant and we are also targeting EAc6 (Green Power) with exemplary performance.
Heat Recovery Counts?
CS-2009 EAc2:On-site Renewable Energyposted by Dina Ammar on
Hello, Will the energy harvested from a heat recovery equipment installed on a chiller and/or the fresh air system in our project count towards on-site renewable energy?
Calculation method
CS-2009 EAc2:On-site Renewable Energyposted by Ciaran McCabe on
Hi to target this credit for a new project do you need an energy model to predict what 1% energy cost of is there an alternative approach ?
Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.