Forum quick links
Exhaust air energy recovery in the baseline
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, my question is: when do i have to consider the exhaust air energy recovery in the baseline building’s AHU? The 90.1 User’s manual reports that exhaust air Energy recovery is required for
Retail and scope for Eap2
CS-2009 EAp2:Minimum Energy Performanceposted by Francine Vaz on
I have a commercial building that will apply for LEED Certification that has the following situation: • The groundfloor has only retail stores in this pavement and the lobby.
For Project outside US, Target Finder seems invalid?
CS-2009 EAp2:Minimum Energy Performanceposted by yu-ju Kao on
Our project is located in Asia, and the Target Finder is to compare the project to a US national database, I assumed that it does not work for projects outside US.
lease agreement for residential units
CS-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
We are working on a CS muti-unit residential project. Does the lease agreement has to be done for future residents to comply with lighting power density indicated on ASHRAE 90.1-2007?
LEED CS - tenant vs Owner insulation
CS-2009 EAp2:Minimum Energy Performanceposted by Lawrence Lile on
I am working with an owner who is developing a speculative office building under LEED CS 2009.
Energy Simulation for a Residential Building - LEED C&S
CS-2009 EAp2:Minimum Energy Performanceposted by Srimannarayana NCVK on
Hi All, We are simulating a residential building aspiring LEED Gold. Project will be registered under C&S rating system.
M&V for C&S buildings of varying occupany when complete
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I have another question related to my last one regarding M&V and the energy model.
fan power calculation
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Gellrich on
Hi everyone, I'm a bit confused about the correct way to calculate BL fan power. The building has 6 stories and therefore 6x System 7 in the BL.
Baseline's chiller performance curve
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Goodmorning, i haven't understood how to consider the performance of the baseline's chiller: is it enough to consider a costant COP/IPLV ( tab. 6.8.1) or do i need a performance curve?
Exterior LIghting - ASHRAE 90.1 Mandatory Provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, We know for the fact that for interior lighting: "Trade-offs among building area types are permitted provided that the total installed interior lighting power does not exceed the interio