Baseline System for Warehouse Shell
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
Wondering how to determine the baseline system for a warehouse that upon initial completion will be a cold, dark shell maintained at 50°F.
High Hazard Areas for Core & Shell
CS-2009 EAp2:Minimum Energy Performanceposted by Michael Trzcinski on
We are working on a warehouse building with attached offices in climate zone 5A, with gas-fired rooftop equipment for heating.
Natural Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi! Currently, I'm working on a warehouse's project under LEED certification. There's no heating/cooling system in the warehouses, there's only natural ventilation.
ASHRAE 90.1 Exit signs - Mandatory Provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Bernadette Stauder-Buschlinger on
In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.
Ashrae 90.1
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hello, I am wonderinq if you can help me: where no heating system exists the heating system classification shall be asummed to be electric, and the system characteristics shall be identical to the
Identical fan power?
CS-2009 EAp2:Minimum Energy Performanceposted by Laura Howe on
We have a comment back from GBCI, stating: 1. The Baseline fan power calculations and the SV-A reports for the Baseline model indicate that the exhaust fan systems (xxx1 and xxx2, as indicated in
Process Load for CS
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
Hallo everyone, I have a question about process energy. My project is a mixed use for CS, contains office, laboratory, lobby, storage and corridor.
C&S project
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hello, i am modeling a C&S project- building of 22 floors. clime type:2A .
Building Area Method applicable for Multi-use-building
CS-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
Assuming a 10 storey building where the first three floors are retail floors and the remaining 7 floors are office floors, is it generally possible to use the building area method? Is it possible t
O1:Interior Lighting Power Density part of Mandatory Provisions?
CS-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
We are pursueing OPTION 1 (Whole Building Simulation). Thus we also have to comply to the mandatory provisions, e.g. section 9.4 for lighting.