Design Process Load requirements?
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
If a mechanical design engineer adds a note on the mechanical schedules stating "AHU capacities shown are based upon 4Watts/S.F.
Service Hot Water
CS-2009 EAp2:Minimum Energy Performanceposted by Anna Korinkova on
Dear fellow LEEDusers. Our base building (C&S) has not included a service hot-water system (it will be installed by tenants later) and therefore we modelled the Proposed Building Performance an
Toilet Light Shut-Off
CS-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, bathrooms can have a manual shutdown device for lighting? It is mandatory that all toilets automatically switch off the lighting? Thanks
Tennant Space Layout
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
The LEED reviewer for a Core and Shell Office Building has requested the design team to illustrate a hypothetical layout of the tenant spaces to document the potential for Daylighting/Views credits
Open Sales Area - qualifications
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We are on our final review for EAp2 and have changed site area from plaza designation to an "outside sales area." The owner proposes to have concerts, arts festivals,etc.
Reset temperature??
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We are on our final review. LEED reviewers have stated that the Baseline Case system input reports indicates that supply air temperature reset was not modeled as required by Section G3.1.3.12.
Tenant area with prescribed HVAC system in a CS project
CS-2009 EAp2:Minimum Energy Performanceposted by farhana imran on
Dear Expert, In our CS project the owner wants to limit the tenants to a specific HVAC system with under floor air distribution.
Receptacle equipment in a Core&shell office building
CS-2009 EAp2:Minimum Energy Performanceposted by Eleftherios Zacharakis on
When using Table G-C in User's Manual for ASHRAE Standard 90.1-2010 to define the receptacle equipment power density in an office building, shall I assume that even the Servers power density is inc
airflow control in a reference building
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
In our proposed building we have CAV ventilation system which at night (when there's noone in the building) will provide 50% of the designe airflow rates.
Modeling the envelope
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
Two short questions about modeling the envelope: 1. For my proposed model, am I required to follow the tables from appendix A even when my project is outside the US?