acceptability criteria of approximate HVAC models

CS-2009 EAp2:Minimum Energy Performance
posted by  Rosana Correa  on 

Dear All, I am modeling an existing building with a Water-cooled VRF HVAC system.

1
Wed Apr 11, 2012, 1:56 pm

Semi-conditioned Baseline requirements

CS-2009 EAp2:Minimum Energy Performance
posted by  Michael Ozenich  on 

I have a heating-only warehouse (with small conditioned office) I'm modeling for C&S 2009.

1
Sun Oct 23, 2016, 6:45 pm

Proposed Building Envelope Assembly Thermal Properties

CS-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

How do I calculate the U-factor for the construction assembly (e.g walls) according to ASHRAE 90.1-2007 Appendix A if one or some of the construction layers properties are not specified in the ment

1
Thu May 31, 2012, 6:50 pm

Help with table G3.1.1A,B

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

The project consists of non residential building of 6 stories.

1
Fri Jan 24, 2014, 3:13 pm

Proposed design modelling

CS-2009 EAp2:Minimum Energy Performance
posted by  Sivarajah Ragulakeethan  on 

Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.

1
Wed Jun 28, 2017, 4:47 pm

Sort chiller heat pump in ASHRAE 90.1-2007

CS-2009 EAp2:Minimum Energy Performance
posted by  Diego Escalona  on 

Hello all, I'm participating in a project of a building of 20 floors of offices, of which the first corresponds to shops and entrance hall.

1
Tue Aug 14, 2012, 9:18 pm

Occupancy Sensors for 'Back of House' space

CS-2009 EAp2:Minimum Energy Performance
posted by  Laura Charlier  on 

As it relates to occupancy sensors being installed in all 'back of house' spaces for this credit, what encompasses back of house spaces? Is there a comprehensive list? i.e.

1
Tue May 27, 2014, 4:16 pm

Electric Resistance Heating

CS-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

What are the mandatory provisions for fan coils whose coils are heated through electrical resistances? I think par. 6.4.3.3.1 for the control. Something else?

1
Tue Dec 9, 2014, 7:46 pm

Baseline for Data Center

posted by  Billy Ng  on 
1
Thu Jan 13, 2011, 2:07 pm

LEED CS - EAp2 Existing equipment to remain

CS-2009 EAp2:Minimum Energy Performance
posted by  BAOQUY VU  on 

I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of VAV boxes with electric reheat and rooftop units that also have electric heat.

1
Wed Sep 28, 2011, 1:58 am