Forum quick links
acceptability criteria of approximate HVAC models
CS-2009 EAp2:Minimum energy performanceposted by Rosana Correa on
Dear All, I am modeling an existing building with a Water-cooled VRF HVAC system.
Semi-conditioned Baseline requirements
CS-2009 EAp2:Minimum energy performanceposted by Michael Ozenich on
I have a heating-only warehouse (with small conditioned office) I'm modeling for C&S 2009.
Proposed Building Envelope Assembly Thermal Properties
CS-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
How do I calculate the U-factor for the construction assembly (e.g walls) according to ASHRAE 90.1-2007 Appendix A if one or some of the construction layers properties are not specified in the ment
Help with table G3.1.1A,B
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
The project consists of non residential building of 6 stories.
Proposed design modelling
CS-2009 EAp2:Minimum energy performanceposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.
Sort chiller heat pump in ASHRAE 90.1-2007
CS-2009 EAp2:Minimum energy performanceposted by Diego Escalona on
Hello all, I'm participating in a project of a building of 20 floors of offices, of which the first corresponds to shops and entrance hall.
Occupancy Sensors for 'Back of House' space
CS-2009 EAp2:Minimum energy performanceposted by Laura Charlier on
As it relates to occupancy sensors being installed in all 'back of house' spaces for this credit, what encompasses back of house spaces? Is there a comprehensive list? i.e.
Glazing specifications for existing building
CS-2009 EAp2:Minimum energy performanceposted by João Costa on
Hi, I am developing a simulation (EAP2/LEED CS) for an existing building located in Rio de Janeiro.
LED podium box for advertisement
CS-2009 EAp2:Minimum energy performanceposted by Katrina Chong on
Does anyone know whether LED monitors for advertisement are considered as exterior lighting? Does it need to comply with the 2.2W/m2 Exterior LPD requirement as stipulated in ASHRAE 90.1?
typical floor v/s whole building simulation
CS-2009 EAp2:Minimum energy performanceposted by shashank jain on
Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.