Forum quick links
Minimum IAQ Performance Calculator - Multiple Zone and 100% OA
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I have difficulty filling out the Minimum IAQ Performance Calculator table for multiple zones.
Ventilation rates at unoccupied rooms
CI-2009 IEQp1:Minimum IAQ Performanceposted by Stacey Olson on
This project is in California, and ventilation rates comply with Title 24.
Switching from Appendix A to Table 6-3 to calculate Ev
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I am using an old 62MZ calculator file to do comply with the IEQp1 prerequisite. However, after adjusting the ventilation rates for peak heating mode, Ev cannot be calculated on the spreadshe
IEQp1 - LEED CI 2009
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hi, I have completed an offline (active) IEQp1 form which shows that pre-requisites are being met. When I complete the same form online, the result is that the pre-requisites are not being met.
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Ds Narrative
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bob Baker on
I am new to the ASHRAE MZ62 calculator and I am not clear on how to write the narrative regarding : Ds - If not all zones are entered, provide a description of how the system Ds value was calculate
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
Local Code
CI-2009 IEQp1:Minimum IAQ Performanceposted by Linda Wan on
Does anyone know if for ventilation requirements Title 24 - 2005 is acceptable in lieu of ASHRAE 62.1-2007? I know for EAc1 Title 24 - 2005 is seen as equivalent to ASHRAE 90.1- 2007.
Base Building ASHRAE 62 Compiance
CI-2009 IEQp1:Minimum IAQ Performanceposted by breeze glazer on
IEQc1 requires confirmation that the building services have been designed in accordance with ASHRAE. A statement from the mechanical engineer is required to demonstrate this.
IEQp1 online form
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
I have input my info but it is not complying with IEQc2. Do the uploaded forms need to be pre-approved before it will comply? Also do I need to fill out the Appendix?