Construction IAQ Management Plan—Before Occupancy
Filter by location
Forum
Topic
Replies
Recent

Temperature and Humidity Monitoring During Flush

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Nancy Henderson  on 

Is it part of the requirement of this credit to monitor temperature and humidity in the space during the flush out - or is it sufficient to provide the temperature set points and calculate the resu

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Mar 13, 2018, 3:01 pm

Question on Selecting IAQ Test Locations

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Melissa Wrolstad  on 

I am working on a small ~6,500 sq. ft. LEED-CI office space.

1
Mon Nov 4, 2013, 4:26 am
1
Thu Jan 21, 2010, 1:02 am

IEQc3.2 VOC Testing

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  mark morehouse  on 

I have a 191,000 sf nc school that will require 11 sample points.

1
Mon Aug 13, 2012, 3:59 pm

Option 1: Full Flush-out Before Occupancy - Is there a Min. CF?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michelle Bracewell-Musson  on 

With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min.?

1
Thu Sep 22, 2011, 3:37 pm

Is flush out possible in countries with high humidity?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Katherine Ann Resurreccion  on 

Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?

1
Tue Sep 3, 2013, 9:46 pm

IAQ Testing AFTER Occupancy?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  buddy pribish  on 

I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin

1
Fri Sep 14, 2012, 11:16 pm

IAQ testing in a continuously occupied office

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Maggie Edelstein  on 

Our project is a government office that will be continuously occupied throughout the duration of construction.

1
Tue Sep 3, 2013, 9:47 pm

Option 1 - Path 2

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Nancy Henderson  on 

I just had a mechanical engineer point out that the partial flush-out option does not include the requirement to maintain 60 degree temperature and 60% humidity.

1
Sat Jul 28, 2012, 1:07 am

outdoor delivery rates in a naturally ventilated space

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Vera Voropaeva  on 

After receiving the project's review we are asked to provide outdoor delivery rates.

1
Thu Mar 21, 2013, 7:39 pm