I am working on a small ~6,500 sq. ft. LEED-CI office space. The space is served outdoor air from a single base building system, and then air is recirculated within the space by a ventilation system with a series of VAVs. Does this space need one (1) or two (2) test locations?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.