Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green Education

EBOM-2009 IOc1:Innovation in Operations
posted by  SIG - Sustainability Main Account  on 

I'd like to ask if anyone can share success stories of how they successfully educated tenants about 'What is LEED.' I am finding that in existing buildings, even though we held lunch and learns wi

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Aug 3, 2012, 8:47 pm

How to conduct a flush out during a phased construction project

Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Cheryl Burkinshaw  on 

We are working on a renovation project where construction is being conducted in phases.

3
Fri Aug 3, 2012, 8:26 pm

ACP forms and documentation guidance

General forums
posted by  Jens Apel  on 

Could anyone please guide me to the current ACP forms and the documentation guidance?

3
Fri Aug 3, 2012, 1:44 pm

DX unit EER and Fan Power

NC-2009 EAc1:Optimize Energy Performance
posted by  Steven Er  on 

Hi, I understand EER of DX unit from ASHRAE 90.1 include indoor fan power. Compressor and condenser fan power shall be derived from EER that subtracting indoor fan power.

3
Fri Aug 3, 2012, 9:29 am

+50% Alteration?

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Michelle Bracewell-Musson  on 

I have come across this on more than one occasion and different projects (CI and EBOM).

5
Thu Aug 2, 2012, 7:40 pm

Waste audit

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Harsha Sharma  on 

I am working on an Environmental Retail Store which comprises of environment friendly products, appliances, organic food items, clothing along with a Cafe and 4 office spaces.

2
Thu Aug 2, 2012, 5:22 pm

Changes to system after project has been certified, what to do?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Courtney Royal  on 

What is your experience with LEED projects that remove a specific technology (project did earn a LEED point) due to another recommendation, say a third party energy audit after the project was alre

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Aug 2, 2012, 4:57 pm

Project in Europe and Energy Star

CI-2009 EAp2:Minimum Energy Performance
posted by  Maria Porter  on 

I’m starting to realize that it will be hard to find Energy Star rated equipment in Sweden. Computers – no problem, but for fridges, dishwashers etc we use the European EU energy rating system.

5
Thu Aug 2, 2012, 12:48 pm

42" line of sight

posted by  Rebecca Molldrem  on 
12
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Aug 1, 2012, 8:05 pm

Design air flow rate

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I don’t understand the meaning of paragraph G3.1.2.8 of ASHRAE 90.1, in particular: “System design supply airflow rates for the baseline buildings design shall be based on a supply-air-to-room-air

2
Default Avatar
P.E.
Midwest Engineering Professionals
LEEDuser Basic Member
2 thumbs up
Wed Aug 1, 2012, 2:00 pm