We are working on a renovation project where construction is being conducted in phases. The first phase will be occupied with temporary floor finishes in some spaces prior to final install of floors in public areas. Can we still conduct a flush out of the building and have it fulfill the requirements of this credit after the final flooring is installed if the area of the building has been occupied?