Check MPRsGeneral forumsposted by Tristan Roberts on Jun 30, 2010, 10:28 pm
Summer, if you haven't already, I recommend reviewing LEED's Minimum Program Requirements for background on some rules... |
|
LEED rating system selection policy- schoolsGeneral forumsposted by Tristan Roberts on Jun 30, 2010, 10:22 pm
Denise, that depends on the specifics of the schools project—what grade level and how much of it is learning space. Check out the LEED... |
|
Interior Light Fixture exemption- no direct line of siteEBOM-2009 SSc8: Light Pollution Reductionposted by John Ida on Jun 30, 2010, 9:25 pm
Our building is a warehouse with only a single string of clerestory windows at the peak of a gabled roof. All interior light fixtures are ceiling hung T-8s that are 10-12 feet below the bottom... |
|
EAp2 LEED Online formCS-2009 EAp2: Minimum Energy Performanceposted by Richard Fost on May 4, 2010, 4:42 pm
For a core & shell project in which the developer does not have control over interior (tenant) build-out, why does the LEED Online form require (or is automatically populated with) EPA Target... Last reply: Christopher Schaffner, Jun 30, 2010, 7:01 pm |
|
Alternative Compliance ApproachEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Richard Navarro on Jun 30, 2010, 12:51 pm
Hi I was wondering if it was possible to document the solid waste management for both ongoing and durable goods in an alternative way. The problem we are encountering is that we are trying to... Last reply: Dan Ackerstein, Jun 30, 2010, 1:21 pm |
|
Automatic Light Shut-off for the Whole BuildingCI-2009 EAp2: Minimum Energy Performanceposted by Dee Spiro on Jun 30, 2010, 10:29 am
In Section 9. Lighting Requirements (ASRAE 90.1-2007) on page 141 of the reference guide, in the third paragraph it states that Section 9.4 describes the mandatory provisions for controls,... Last reply: Paul Conrad, Jun 30, 2010, 10:39 am |
|
Asbestos abatement for existing buildings prior to demolitionCS-2009 SSc3: Brownfield Redevelopmentposted by Kelly Pimmel on Jun 25, 2010, 6:14 pm
I'm working on two projects (LEED - CS v2 and LEED 2009 - NC) that both require the demolition of existing buildings on the project sites. The existing buildings have asbestos and other... Last reply: David Posada, Jun 28, 2010, 5:48 pm |
|
Another question on 20% minEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Matthew Macko on May 4, 2010, 2:50 pm
Lauren, thanks for your comments above on the 20% adoption criteria. That said, it still seems that achieving and documenting anything less than complete adoption quickly gets into a big grey... Last reply: Rachael McClain, Jun 28, 2010, 12:17 pm |
|
In the lease, but not in the scopeCI-2009 EAp2: Minimum Energy Performanceposted by Dee Spiro on Jun 24, 2010, 1:05 pm
For prescriptive compliance, is a CI project required to meet continuous insulation requirements for building envelope if it is not part of their project scope, even if there is nothing in the... Last reply: Paul Conrad, Jun 28, 2010, 9:45 am |
|
Furniture?NC-2009 MRc7: Certified Woodposted by Carrie Bradley on Jun 25, 2010, 4:49 pm
Would fixed auditorium seating be included in the MR credits, or considered furniture? Same for a demountable wall system? Last reply: Tristan Roberts, Jun 28, 2010, 8:38 am |