Log in
Forum
Topic

LEED EB O&M

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Pal Ahuja on Aug 29, 2010, 5:20 pm

An exisitng Nursing Home (Long Term Care) building is planned to have major renovations including new Mechanical & Electrical Systems, targeted for EB O&M after renovations.
...

Last reply: Tristan Roberts, Aug 29, 2010, 8:13 pm

LEED for Schools 2007- EAc1- Optimize Energy Performance

Schools-2009 EAc1: Optimize Energy Performance
posted by Theresa Lehman on Aug 26, 2010, 11:57 am

My project received the following Technical Advice offered by...

Last reply: Marcus Sheffer, Aug 29, 2010, 5:51 pm

Baseline case: No Baseboard Radiators?

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Aug 24, 2010, 11:43 am

I'm looking for where the Appendix G incorporates Radiators or other heating types like radiant floor in the baseline model, but can't find it. Does this mean that the baseline brings all the...

Last reply: Marcus Sheffer, Aug 29, 2010, 5:42 pm

fire stopping sealants and duct sealants

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Peter Doo on Aug 16, 2010, 1:52 pm

I am assuming that the...

Last reply: Shannon Gray , Aug 27, 2010, 4:57 pm

VOC testing method

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Victoria Lockhart on Aug 9, 2010, 11:46 am

so for a project in europe we have recently been submitted a breakdown of...

Last reply: Shannon Gray , Aug 27, 2010, 4:46 pm

LEED for Schools- EQc8.1 Daylighting

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Greg Hackett on Aug 26, 2010, 4:02 pm

Am I correct in saying that the following spaces would be considered "classroom spaces" and therefore contribute to the first 2 points of this credit:

1. Elementary Classrooms
2....

Last reply: Carly Ruggieri, Aug 27, 2010, 12:20 pm

BOP & ASHRAE

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Pablo Fortunato Suarez on Aug 26, 2010, 11:30 am

The LEED Guidebook cites the ASHRAE 2007 Handbook as reference material and the sample...

Last reply: Jenny Carney, Aug 26, 2010, 4:22 pm

On-Site Renewables- Submeters installed and Performance Period

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by John Ida on Aug 18, 2010, 8:44 pm

For our project, the office building has had a Solar Thermal Array that runs one of their packaged ACUs last year We are now installing the BTU submeters to measure the actual energy generated...

Last reply: Jenny Carney, Aug 26, 2010, 4:18 pm

Vacant Space

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Alice Cook on Jul 29, 2010, 1:24 pm

Portfolio Manager guidance currently indicates that if vacant space is less than 10%, then it should be grouped with occupied space. However, I read the USGBC Information Guidance version 1...

Last reply: Jenny Carney, Aug 26, 2010, 4:15 pm

Re: owner adds work outside of LEED Site Area

General forums
posted by David Posada on Aug 26, 2010, 12:18 pm

It probably depends on the timing and the nature of the additional work.

For changes made *inside* the LEED Boundary after the Design Phase review, but before the Construction Phase...