Topic | Recent |
---|---|
Acceptable documentation for LEED for Schools, 2007Schools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Alison Y Rivenburgh on Jan 21, 2011, 11:54 am
For a LEED for Schools, 2007 project we have provided for the LEED construction documentation reviewers a list of ceiling and wall system components used on the project with the coordinating... Last reply: Josh Jacobs, Jan 21, 2011, 4:22 pm |
|
Flat Primer VOCSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Denise Shimabukuro on Dec 6, 2010, 4:40 pm
GS-11 allow primers to have a... Last reply: Josh Jacobs, Jan 21, 2011, 4:21 pm |
|
ASHRAE 62 CalcsEBOM-2009 IEQc1.3: Indoor air quality best management practices - increased ventilationposted by Richard Navarro on Jan 13, 2011, 6:00 pm
I input information into their Online spreadsheet, but the numbers didn't seem to match with what our Engineer has as constants for the spaces when the ASHRAE 62 Audit was done. Also some spaces... Last reply: Dan Ackerstein, Jan 21, 2011, 3:54 pm |
|
Definition of Occupied SpaceEBOM-2009 IEQc1.2: Indoor air quality best management practices - outdoor air delivery monitoringposted by Simon Sue on Jan 18, 2011, 5:14 am
LEED EBOM ed 2009,... Last reply: Dan Ackerstein, Jan 21, 2011, 3:44 pm |
|
2007UM_62MZCalc.xls and Table. Ventilation Air Flow SummaryEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Simon Sue on Jan 11, 2011, 1:18 am
The credit prompts you to fill out 2007UM_62MZCalc.xls to calculate required OA, and transfer the data to submittal form in LEED online under "Table. Ventilation Air Flow Summary." However, with... Last reply: Dan Ackerstein, Jan 21, 2011, 3:34 pm |
|
see the FAQGeneral forumsposted by Tristan Roberts on Jan 21, 2011, 2:53 pm
Hi Caroline, I have an attempted answer to this question in our FAQ (link to that is in the right sidebar of every page, FYI). |
|
Path 2 Stormwater Quantity ControlCI-2009 SSc1: Site Selectionposted by Seung Shin Na on Jan 16, 2011, 10:07 pm
Our future building owner is considering to install stormwater collection tank. Therefore we're trying to recommend the owner to comply with the LEED requirement. Last reply: Amy Rider, Jan 21, 2011, 2:45 pm |
|
Usage and days of operationGeneral forumsposted by J W on Jan 20, 2011, 5:04 pm
I have two questions regarding this form for schools. I have a k-12 school. In the "Space Usage Type" - should each part of the school (ie, the elementary wing, high school wing, office,... Last reply: Ben Stanley, Jan 21, 2011, 1:44 pm |
|
New Chiller Installation & Performance PeriodEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Dana Dinolfo on Jan 21, 2011, 12:34 pm
Hello: We are beginning an... Last reply: Maria Unruh, Jan 21, 2011, 12:53 pm |
|
Assembly Recycled ContentNC-2009 MRc4: Recycled Contentposted by Mark Benson on Jan 20, 2011, 1:33 pm
I am looking for a list of the typical products that are considered an... Last reply: Anne Nicklin, Jan 21, 2011, 12:14 pm |