DEMAND CONTROL VENTILATION AND LIGHTING CONTROL

NC-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Jun 7, 2010, 8:32 pm

How can I model DCV and Lighting Control into Carrier HAP 4.5. I know I can do it changing schedules. Does anyone have reference schedules or is there a way of building a real schedule to my own...

Last reply: Christopher Schaffner, Jun 11, 2010, 9:23 am

Energy modeling

NC-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Jun 7, 2010, 8:27 pm

I use Carrier HAP 4.5 for Energy Modeling, how can you model an international project if the Country you are modeling is not in the weather data base. Is it valid to use a Country or region next...

Last reply: Christopher Schaffner, Jun 11, 2010, 9:19 am

A question on Mandatory Provisions

CI-2009 EAp2: Minimum Energy Performance
posted by Jose Salinas on May 26, 2010, 5:32 pm

I am working on a CI for three floors of a new existing building, non-LEED certified.
We are developing a computer simulation so we have to document the ASHRAE Mandatory provisions only. (...

Last reply: Paul Conrad, Jun 11, 2010, 9:01 am

Alarming

General forums
posted by Tristan Roberts on Jun 11, 2010, 8:34 am

Wow, that's alarming! I haven't heard of it happening or seen it myself but I'm asking around. I assume you've been in touch with...

Humidity Sensors

EBOM-2009 IEQc2.3: Occupant comfort - thermal comfort monitoring
posted by Ashu Gupta on Jun 11, 2010, 7:26 am

Is it necessary to install humidifier in every HVAC zone ?

Last reply: Tristan Roberts, Jun 11, 2010, 8:18 am

System from LEED NC v2 but no points awarded. O&M Option?

EBOM-2009 SSc6: Stormwater Quantity Control
posted by Avkash Patel on Jun 8, 2010, 10:54 am

Dear Users,

After researching this credit for my building, it seems when the building was first constructed it was designed to take advantage of storm water quantity control, pervious...

Last reply: Tristan Roberts, Jun 10, 2010, 11:38 pm

InternaionProjects Benchmark- Building Location Not in EStar

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Ashu Gupta on Jun 10, 2010, 2:55 am

We are doing a LEED EB project in India. EStar having only 4 locations in India, our project location is only 100 mile far away from the EStar specified location. Climate are almost same of both...

Last reply: Jenny Carney, Jun 10, 2010, 11:06 pm

How far do we go with finding individual pricing?

NC-2009 MRc4: Recycled Content
posted by April Ambrose on May 26, 2010, 4:30 pm

The new version 3 requires us to not just list how much paint cost for the project, say $10,000. Rather, we have to list how much a can of paint costs, like $20 and how many cans were used. How...

Last reply: Anne Nicklin, Jun 10, 2010, 9:53 pm

Are tapes covered under this credit?

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by April Ambrose on May 26, 2010, 4:10 pm

We have had some duct tapes, and double coated tapes used on a job. Are these also required to be compliant via this credit?

Last reply: Mara Baum, Jun 10, 2010, 9:44 pm

What are Typical "Big Ticket" materials

NC-2009 MRc5: Regional Materials
posted by Jean Marais on Apr 26, 2010, 9:54 am

Steel
Concrete
...what else?

Last reply: , Jun 10, 2010, 8:31 pm