Log in
Forum
Topic

Major Renovation on Military Barracks

NC-2009 SSc2: Development Density and Community Connectivity
posted by Mike Phelps on Aug 2, 2010, 9:22 am

We are responding to an RFP for major renovation of existing barracks. The barracks themselves exceed the...

Last reply: Larry Jones, Aug 5, 2010, 6:41 pm

LEED for schools 2007 EQp3

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Breana Detzler on Aug 4, 2010, 3:43 pm

We are currently calculating our sound absorption coefficients for LEED for Schools 2007 EQ Prerequsite 3 and have formulated a couple questions.

1: Should we include built-in casework in...

Last reply: Joseph F. Bridger, Aug 5, 2010, 4:10 pm

window area

CI-2009 IEQc8.1: Daylight and views - daylight
posted by kelvin duen on Jul 30, 2010, 2:19 pm

I realized the answer for my second question. Heres another one. This is more for verification. I am unsure if it is the same for CI v3 but in the reference guide for CI v2 it states that "window...

Last reply: Jill Perry, PE, Aug 5, 2010, 2:54 pm

Office Building with Restaurant/Kitchen

NC-2009 WEp1: Water Use Reduction
posted by Tatjana Ernst on Apr 27, 2010, 4:52 am

We have a office building with a restaurant/kitchen. Do i have to calculate the water consumption in the kitchen? I understand the reference guide like that we only have to calculate the water...

Last reply: Patrick Moore, Aug 5, 2010, 1:09 pm

Step 8- Verify the installation and performance

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Fabio Frescia on Aug 3, 2010, 10:22 pm

Dear all,
We have some issue that is not clear about the responsibility, like bellowing:
Follow docs. guideline of...

Last reply: Chris Ladner, Aug 5, 2010, 11:15 am

tenant scope

General forums
posted by Tristan Roberts on Aug 5, 2010, 10:21 am

Andreas, the LEED-CI certification process covers spaces that are within the tenant scope of work, not "...

Pilot credit Availability

Pilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by Yong Lee Low on Aug 4, 2010, 11:44 pm

Currently, I am able to score 2 to 3 points under innovation through...

Last reply: Tristan Roberts, Aug 5, 2010, 9:16 am

Buildings to be built in stages

CS-2009 SSc5.1: Site development - protect or restore habitat
posted by javier bolanos zeledon on Aug 2, 2010, 8:09 pm

For this credit and 5.2 Maximize Open Space.
If I have a site in which 3 buildings are going to be built in three different stages and only the first one will be built at the moment and...

Last reply: Tristan Roberts, Aug 4, 2010, 11:20 pm

About Design of IEQc8.1

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Billy Ng on Jul 30, 2010, 12:46 am

I am working on core and shell project, building a data center. in order to get this credit, i need to have...

Last reply: Tristan Roberts, Aug 4, 2010, 11:08 pm

Janitor Sinks

CI-2009 WEp1: Water Use Reduction
posted by Eric Doyle on Jan 19, 2010, 12:36 pm

The EPAct of 1992 does not include Janitor’s Sinks in its regulation. See the addenda posted on November 2, 2009. For the...

Last reply: Lauren Sparandara, Aug 4, 2010, 5:39 pm