Topic | Recent |
---|---|
Total Site Area- LEED Boundary or Property Line?NC-2009 SSc5.1: Site development - protect or restore habitatposted by Peter Wurst on Oct 14, 2010, 8:12 pm
We are renovating an existing building, providing a large footprint of new construction, and have designated the LEED boundary for our project to include all site that has been disturbed or... Last reply: Tristan Roberts, Oct 15, 2010, 10:57 pm |
|
Day Care in LEED-NC 2.2NC-2009 WEp1: Water Use Reductionposted by sara theodore on Oct 15, 2010, 10:27 am
I have a daycare facility with children from 0 yrs old to preschool age with one classroom for after school kids which I assume is older children. Realistically, I’d say all the children would... Last reply: Tristan Roberts, Oct 15, 2010, 10:45 pm |
|
SMACNA guidelinesEBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Jutta Berns on Oct 12, 2010, 8:45 am
do draft the... Last reply: Allison Beer McKenzie, Oct 15, 2010, 10:38 pm |
|
meter owned by building owner or utilityEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Rachael McClain on Oct 12, 2010, 12:55 pm
I was wondering if someone could clarify something for me. We have a situation where we need to submeter our builidng because it currently shares a meter with other buildings. The reference... Last reply: Jenny Carney, Oct 15, 2010, 8:51 pm |
|
Total credits by ex exemplary performanceCS-2009 IDc1: Innovation in Designposted by javier bolanos zeledon on Sep 26, 2010, 3:59 pm
On CS 2.0 How many credits from the 1.1-1.4 can you earn by exemplary performance. I know for v 2009 is three, but I don't know if this is a change between CS2.0 and V2009. Thanks. Last reply: javier bolanos zeledon, Oct 15, 2010, 6:58 pm |
|
PLf2General forumsposted by Tristan Roberts on Oct 15, 2010, 5:30 pm
I wouldn't sweat it too much. I don't think that particular piece of data has any major bearing on LEED credit achievement. Go with what seems right. |
|
Retention Pond = zero potable water usage?EBOM-2009 WEc3: Water Efficient Landscapingposted by Paul C on Sep 13, 2010, 3:11 pm
Our project site has man-made on-site ponds which we use for irrigation and any run-off goes back into the ponds so we do not use any city potable water supply. Would the ponds be considered a... Last reply: Tristan Roberts, Oct 15, 2010, 4:51 pm |
|
Refrigerant Phase Out FeasibilityNC-2009 EAp3: Fundamental Refrigerant Managementposted by Michael Tillou on Oct 5, 2010, 12:19 pm
We are designing a building for a client that will use purchased steam and chilled water from a local central plant. The central plant still has R-11 chillers and we advised them they needed a... Last reply: Shillpa Singh, Oct 15, 2010, 4:36 pm |
|
percentage of spacesGeneral forumsposted by Tristan Roberts on Oct 15, 2010, 6:28 am
Jeff, which LEED rating system are you using? What's the rough percentage of spaces that will be finished vs. those requiring fit-out? Last reply: Jeff Riggs, Oct 15, 2010, 6:56 am |
|
Certification PeriodCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Lori Selcer on Oct 14, 2010, 4:40 pm
The EQ4.5 template form requires that the "Test Date or Certification Period" be supplied. the Greenguard Certificate of Compliance provides a period range of compliance, not a single date. the... Last reply: Tristan Roberts, Oct 15, 2010, 6:36 am |