Topic | Recent |
---|---|
Pilot Credit #45 is a very indepth site analysisPilot-Credits SSpc45: Site assessmentposted by Kendal Neitzke on Oct 18, 2011, 3:19 pm
Our project site has a development history going back to the mid-1800's which included a rather lengthy and involved brownfield remediation. Although the documentation for this credit required a... |
|
System status report for ventilation systemEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Sundararaj Subburaman on Mar 31, 2011, 7:44 am
We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system. To comply with the prerequisite requirements, we... Last reply: Alexa Stone, Oct 18, 2011, 1:54 pm |
|
Definition of "Outdoor Air"NC-2009 IEQp1: Minimum indoor air quality performanceposted by James Chueh on Sep 27, 2011, 11:08 pm
We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces... Last reply: Roger Chang, Oct 18, 2011, 1:37 pm |
|
Are Form submetering requirements greater than Ref Guide?CI-2009 EAc3: Measurement and Verificationposted by Raphael Sperry on Sep 28, 2011, 4:19 pm
In Case 1 (project Last reply: Ante Vulin, Oct 18, 2011, 11:44 am |
|
Field PersonnelGeneral forumsposted by Emily Catacchio on Oct 17, 2011, 6:09 pm
In my opinion, yes. Though I have not used it specifically in the field. |
|
SSc6.1 Pond with Flow Restrictor and Total Stormwater VolumeNC-2009 SSc6.1: Stormwater design - quantity controlposted by Sandra Bauder on Oct 13, 2011, 9:32 am
I am having the same issue as Lucy (October 18, 2010) on one of our current projects, and the comments by Gregory and Jennifer were helpful but I still have some questions. Last reply: Sandra Bauder, Oct 17, 2011, 3:16 pm |
|
Can A Dormitory Count for the 10 Units per Acre Requirement?NC-2009 SSc2: Development Density and Community Connectivityposted by Landon Chapman on Oct 14, 2011, 4:42 pm
I've got all options satisfied for Option 2 but I'm having trouble with the 10 units per acre requirement. There is an existing dormitory within the 1/2 mile radius (and, in fact, my project is... Last reply: Patrice Coffman, Oct 17, 2011, 1:34 pm |
|
EAp2- Energy Modelling and Process LoadsNC-2009 EAp2: Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on Oct 17, 2011, 11:46 am
Hi, I am working on a project (Stadium) where the only significative improvement on energy performance is lighting because the COP of the HVAC is basically the same and the envelope is... Last reply: Marcio Alberto Casado Pereira, Oct 17, 2011, 12:50 pm |
|
NC or CSLEED Rating System Selectionposted by Magnus Stagnäs on Oct 16, 2011, 2:08 pm
Our client (who is also the building owner) is performing a major renovation of an existing office building. The project scope includes the core and shell structures as well as a complete... Last reply: Magnus Stagnäs, Oct 17, 2011, 12:43 pm |
|
Upload EAp2-11CS-2009 EAp2: Minimum Energy Performanceposted by Morteza Kasmaei on Oct 15, 2011, 1:16 pm
I'm using eQUEST for my project. I should upload certain documents for LEED review including "Input Summary". Do I have to create a summary report or there is a summary report within the eQEST... Last reply: Marcus Sheffer, Oct 15, 2011, 2:42 pm |