Topic | Recent |
---|---|
Recycled water from Local GovernmentNC-2009 WEc2: Innovative Wastewater Technologiesposted by Eric JS on Sep 14, 2010, 10:42 pm
Hi all, If we use non-potable recycled water supplied by local government, can it be eligible for the point? The recycled water is still not available for the whole country (... Last reply: Tristan Roberts, Sep 28, 2010, 11:37 pm |
|
50 % Pervious Pavement or Each Paver need to be 50% Pervious?CI-2009 SSc1: Site Selectionposted by Simon Sue on Sep 13, 2010, 3:57 am
Hi, when i look at SSC1 path 4, i keep asking the above question to myself, therefore, which one is the correct defination for "2. indentify all hardscape surfaces that are open... Last reply: Tristan Roberts, Sep 28, 2010, 11:26 pm |
|
performance periodEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Pablo Fortunato Suarez on Sep 28, 2010, 3:33 pm
There were exterior and hardscape management procedures in practice in the past which are LEED compliant. A... Last reply: Tristan Roberts, Sep 28, 2010, 10:21 pm |
|
Default value for open grid paver.CI-2009 SSc1: Site Selectionposted by Simon Sue on Sep 13, 2010, 3:59 am
Hi all, Last reply: Tristan Roberts, Sep 28, 2010, 10:16 pm |
|
Value input for "Minimum required outside air flow,CFM"EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Yong Lee Low on Jul 23, 2010, 3:58 am
In this pre-requisite we are following 'Option A' and filling in details in the 2007UM_62MZ Calculator. Further,filling in the online template column 3 in Table 1.1 requires "Minimum... Last reply: Jenny Carney, Sep 28, 2010, 10:12 pm |
|
EP CreditEBOM-2009 MRc8: Solid waste management - durable goodsposted by Walker Burttschell on Sep 27, 2010, 2:04 pm
According to the 2009 reference guide an exemplary performance point is not available for MRc8 (pg. 314). However, the actual credit template allows you to mark it for the extra point. And... Last reply: Tristan Roberts, Sep 28, 2010, 10:05 pm |
|
IESNA RP-33CS-2009 SSc8: Light Pollution Reductionposted by Julie Hendricks on Sep 28, 2010, 4:37 pm
On first submittal of this credit, we got the comment that our project was actually in an LZ-2 zone instead of an LZ-3 zone. We've always decided which zone our project is in based on the... |
|
Table Flush Fixture Data and Flow Fixture DataNC-2009 WEp1: Water Use Reductionposted by Rob Hink on Aug 30, 2010, 2:36 pm
Under the Fixture Group Column; What goes is supposed to be typed in the 'Select' Column? Last reply: Erica Downs, Sep 28, 2010, 2:30 pm |
|
Transfer data to LEED online?Schools-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Nicole Cavanaugh on Sep 28, 2010, 10:28 am
How do we go about transferring the data from the provided LEED template to the online form? (Assuming there is an easier way than re-entering all the info? ) Thanks for your help! Last reply: Tristan Roberts, Sep 28, 2010, 10:56 am |
|
How do you calculate Transient visitors?CS-2009 WEc3: Water Use Reductionposted by Kathy Caswell on Sep 28, 2010, 7:58 am
I can not figure out how to calculate this for a core and shell office building that is 3/4 leased. Last reply: Tristan Roberts, Sep 28, 2010, 8:25 am |