Topic | Recent |
---|---|
Creating Baseline ΗVΑC system selection based on ΑSHRAE 90.1-2010- Does Ground Floor count as….NC-v4 EAc2: Optimize Energy Performanceposted by Konstantina Kalliakoudi on Jun 16, 2023, 4:38 am
Hello to all LEED Users, Ιn our project the Building (nonresidential – 8.000 m2) consists of following levels:
Last reply: Konstantina Kalliakoudi, Jun 16, 2023, 12:27 pm |
|
Bioretention Area CalculationNC-v4 SSc4: Rainwater managementposted by on Sep 6, 2016, 5:57 pmwill be that I went to school for a long time to learn how to do this, and it isn't something you're going to learn in a forum post. You can try to follow along with that Direct Determination Method,... Last reply: Marc-André Cloutier, Jun 15, 2023, 6:42 pm |
|
Baseline System for Data centerNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jun 1, 2023, 7:07 pm
Hi All, I have read som many answers regarding the baseline system for Data centers, Some are saying use system 8 some are saying use system 3 and 4, which one is the right system? I am working... Last reply: Marcus Sheffer, Jun 15, 2023, 12:39 pm |
|
Mobile Dumpster Compacting- Smash My TrashNC-v4.1 MRp2: Construction and demolition waste managementposted by William Truszkowski on Jun 14, 2023, 12:44 pm
There are a number of mobile dumpster compacting companies such as Smash My Trash or Crushr that provide dumpster compacting to roll-off 20-40 yard dumpsters. I have seen studies that mobile... |
|
If the site is walking distance from two separate stops but service the same routes can you count bothNC-v4 LTc5: Access to quality transitposted by David O'Connell on Jun 14, 2023, 7:22 am
The site is close to two different stops alexion and BDC but the two stops are serviced by the same routes ? can you count both stops towards the total number of buses i.e. if the 236 goes... |
|
LPD of Building Area MethodNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Aug 18, 2016, 7:58 am
1. If we decides to use 'Building area method' for energy modeling. We have to building area type including office and parking garage. Office baseline model... Last reply: Marcus Sheffer, Jun 15, 2023, 8:35 am |
|
Roads with 40 Km / h without bicycle paths or trails are considered as bicycle network?NC-v4.1 LTc6: Bicycle facilitiesposted by Sara BENLOUBA on Feb 19, 2021, 8:15 am
We have a project located in an area where the... Last reply: David O'Connell, Jun 15, 2023, 8:09 am |
|
No more than 25% of the building’s cool-wall area facing away from the equatorPilot-Credits SSpc154: Heat Island Mitigation with Cool Wallsposted by Aleksandra Prawda on Oct 8, 2021, 7:22 am
Hi all, I was considering this pilot credit for some projects, however, I have doubts about this part of the requirement: "To avoid disproportionate placement of cool-wall materials on the... Last reply: Zeynep Cakir, Jun 15, 2023, 7:09 am |
|
"No cooling tower" option removedNC-v4.1 WEc3: Optimize Process Water Useposted by Paula Melton on Dec 2, 2020, 9:39 am
It appears that Option 2, "No Cooling Tower," has been removed from this credit with addendum #10002465. Last reply: Azra, Jun 14, 2023, 6:24 am |
|
Standard EPD to use in LCANC-v4.1 MRc1: Building life-cycle impact reductionposted by Jose MARTINEZ on Jun 13, 2023, 4:08 pm
Good afternoon colleagues, we have recently received comments (by LEED reviewers) about the EPDs we use for LCA in the baseline model that are not the standards to consider in the U.S. industry (... |