Topic | Recent |
---|---|
Edge guards for green roofsNC-2009 SSc7.2: Heat island effect - roofposted by Steve Cattaneo on Aug 2, 2010, 11:55 am
We are designing a low rise residence and the local building official believes we need guard rails an edges > 30'' above grade. We are providing anchor points for maintenance staff. Roof... Last reply: Susan Walter, Jan 11, 2011, 4:01 pm |
|
ClarificationPilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Alejandra Feliciano on Jan 11, 2011, 12:32 pm
Hello! I just want a very general clarification on the submittal requirements for this credit. Specifically, I'd like clarificaiton on the meaning of 'multi-parameter alternative product analysis... Last reply: Abena Darden, Jan 11, 2011, 3:18 pm |
|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC6: Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:50 am
As a reminder, this credit, and credit 5 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Renee Shirey, Jan 11, 2011, 3:14 pm |
|
saving LOv3 formsGeneral forumsposted by Tristan Roberts on Jan 11, 2011, 3:02 pm
Your understanding on both points is correct. If you save the form, you can continue to edit it, until it's submitted for review. |
|
ASHRAE 62.1-2007 section 4CI-2009 IEQp1: Minimum indoor air quality performanceposted by G.J. Teunissen on Nov 10, 2010, 5:12 am
According to this section, a local survey is needed to document the local air quality. But even the... Last reply: G.J. Teunissen, Jan 11, 2011, 2:53 pm |
|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:49 am
As a reminder, this credit, and credit 6 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Joanna Rodriguez, Jan 11, 2011, 1:56 pm |
|
VAV System- LEED Online ventilation rate procedure?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Jan 5, 2011, 7:50 am
Dear all, As I noticed, the LEED Online letter template for IEQ Prereq1 can not be used for... Last reply: Roger Chang, Jan 11, 2011, 1:13 pm |
|
IEQ p1 occupancy rates for ventilation in international settingsNC-2009 IEQp1: Minimum indoor air quality performanceposted by carol soares on Dec 10, 2010, 12:28 pm
Dears, Last reply: Roger Chang, Jan 11, 2011, 1:11 pm |
|
Pc5- PrelIminary Project PlanningPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by John Drigot on Oct 19, 2010, 4:35 pm
The LEED Pilot Credit Library Webinar I participated in today was long overdue and much appreciated. I applied for the Pilot Credit program back on 11/18/2009 and it took until 8/6/2010 before... Last reply: Teresa Cheung, Jan 11, 2011, 12:31 pm |
|
Classroom/Lab exhaust fansSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Keelan Kaiser on Jan 11, 2011, 10:17 am
For science labs that have room exhaust fans, how are they considered in the context of background noise? Are they excluded because of infrequent use, or are they typically required to be... Last reply: Daniel Hicks, Jan 11, 2011, 11:58 am |