Green Power

CI-2009 EAc4: Green Power
posted by Holly Himes on Nov 9, 2010, 3:43 pm

If I purchase my Green Power RECS and then don't submit for say 9 months will the contract still cover my project timeline?

Last reply: Lana Malone, Nov 9, 2010, 3:47 pm

Requirement for landscape but not open space

NC-2009 SSc5.2: Site development - maximize open space
posted by Lauren Sparandara on Nov 8, 2010, 7:53 pm

Hello,

My project has a requirement for landscaping as the city requires that at least 20% of the site is landscaped. Should we state that we fall under Case 1 even though there isn't...

Last reply: Devon Bertram, Nov 9, 2010, 10:51 am

Frequency of Inspections

EBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioning
posted by Maria Unruh on Nov 8, 2010, 5:06 pm

In looking to achieve this credit, I am planning on writing a...

Last reply: Pierce Holstrom, Nov 8, 2010, 7:44 pm

Credit points???

General forums
posted by Bill Swanson on Nov 8, 2010, 1:10 pm

It seems like the value of each credit has yet to be determined. I thought there would be some sort of value comparison released with all future versions of LEED, similar to the 2009 version....

Last reply: Christina Macken, Nov 8, 2010, 4:22 pm

High volume vs. convenience printing?

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Anthony Ravitz on Nov 8, 2010, 3:55 pm

Is there any guidance on what qualifies as convenience printing vs. high volume printing? Is it defined by the volume of printing, occupancy, or equipment type?

Thanks,
Anthony

Last reply: Allison Beer McKenzie, Nov 8, 2010, 4:00 pm

Open & Connected Community for EBOM

Pilot-Credits PC9: Street Network
posted by Dana Dinolfo on Nov 8, 2010, 12:52 pm

Hello:
Can you please tell me why this pilot credit is no longer available to...

Last reply: Batya Metalitz, Nov 8, 2010, 12:59 pm

Great analysis

General forums
posted by Leticia SooHoo on Nov 8, 2010, 12:13 pm

Thank you for the buildinggreen post. I work for a company that does a lot of new building...

Appropriate Waste Categories

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Paul C on Nov 5, 2010, 12:54 pm

I want to make sure what I have is adequate before performing my waste stream audit. On page 301 of the reference guide at the bottom of the page it states "Consider at a MINIMUM, using the...

Last reply: Jason Franken, Nov 8, 2010, 10:39 am

Option 2- Server cooling

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Christian Brücher on Nov 8, 2010, 9:26 am

In our CI-project (2 floors of office space) we want to go for option 2. But we are not sure if we have to include the installed load for cooling the server room into the the total tenant space...

Last reply: Paul Conrad, Nov 8, 2010, 10:36 am

Option 1 Equipment Efficiency- more questions

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nancy Henderson on Nov 4, 2010, 6:03 pm

We have two project pursuing the prescriptive option and each one has issues:

1. A tenant is taking all of an existing buildng and adding a VRF system to supplement the existing system (...

Last reply: Paul Conrad, Nov 8, 2010, 10:34 am