contextGeneral forumsposted by Tristan Roberts on Feb 28, 2011, 8:13 am
Jean, in answering this question it would help to know what it is about. Is this about rating system selection, MPR compliance, an EAc1 issue, or something else? Last reply: Jean Marais, Feb 28, 2011, 8:39 am |
|
Airport jetway re-useCI-2009 MRc3.1: Materials Reuseposted by Raphael Sperry on Feb 23, 2011, 6:41 pm
We have an unusual case in an airport project I am working on. It is LEED-CI as we are refurbishing a passenger concourse and some of the back-of-house spaces that go with it. There are 11... Last reply: Eric Shamp, Feb 27, 2011, 11:25 pm |
|
Case 3 with Development density and Community ConnectivityNC-2009 SSc5.2: Site development - maximize open spaceposted by Valentin Grimaud on Feb 25, 2011, 8:22 am
Hello everyone! I am pretty new at LEED, and I am working on a building in urban areas that will earn SS credit 2. Credit Requirements specifies that "pedestrian-oriented hardscape areas... Last reply: Tristan Roberts, Feb 27, 2011, 3:28 pm |
|
LEED AP CertificateCI-2009 IDc2: LEED Accredited Professionalposted by Michelle Bracewell-Musson on Feb 26, 2011, 11:32 am
Thank you for your comments. I have gone to USGBC and into the My Account section and looked in Personal Information, Membership, Accreditation, etc. and still cannot find it. I can find one... Last reply: Michelle Bracewell-Musson, Feb 27, 2011, 2:57 pm |
|
Online Template Issue- Upload Time Required for IEQp1CI-2009 IEQp1: Minimum indoor air quality performanceposted by Shannon Allison on Feb 25, 2011, 8:52 pm
I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1. The issue I am having is the amount of time required to document a building that has several... Last reply: Roger Chang, Feb 26, 2011, 9:09 am |
|
Approval without any additional approval from the jurisdiction?NC-2009 IEQp1: Minimum indoor air quality performanceposted by William Weaver on Jan 25, 2011, 1:01 pm
Below is a previously submitted credit interpretation that was accepted. Our project is almost identical to the situation that is outlined. The primary difference between our project and the... Last reply: Roger Chang, Feb 26, 2011, 8:55 am |
|
CRI vs. noise level for vacuums.EBOM-2009 IEQc3.4: Green cleaning - sustainable cleaning equipmentposted by Jared Silliker on Jan 25, 2011, 3:37 pm
In responding to review comments on a recent project I'm realizing that the vacuum requirement contains two separate elements, which I previously saw as one. The way the rating and online form... Last reply: Tristan Roberts, Feb 26, 2011, 1:05 am |
|
Existing Building Envelope Calculations- Help!NC-2009 EAc1: Optimize Energy Performanceposted by Jonathan Weiss on Feb 21, 2011, 2:26 pm
According to the Appendix G definition, "for existing building envelopes, the baseline building design shall reflect existing conditions prior to any revisions that are part of the scope of work... Last reply: Marcus Sheffer, Feb 25, 2011, 7:42 pm |
|
EAc1 Combined Heat & Power / CogenerationNC-2009 EAc1: Optimize Energy Performanceposted by Michael Heacock on Nov 6, 2009, 1:04 pm
It would be very helpful to see an example of approved documentation for a combined heat & power project specifically for cogeneration, such as a microturbine. Last reply: Marcus Sheffer, Feb 25, 2011, 7:29 pm |
|
Blow out water closets in LEED for RetailNC-2009 WEc3: Water Use Reductionposted by Anders Olson on Feb 15, 2011, 1:34 pm
The LEED NC for Retail rating system indicates a baseline performance of 1.6 gallons per flush (gpf) for all water closets except blow out fixtures, which are assigned a baseline performance of 3... Last reply: Karen Blust, Feb 25, 2011, 5:45 pm |