Log in
Forum
Topic

Meter Reading Device

EBOM-2009 WEc1: Water Performance Measurement
posted by Paul C on Dec 1, 2010, 2:55 pm

Has anyone had any luck with a electronic device that allows for an easy, cost effective method to collect meter readings?

I have contacted our utility provider who uses a hand held unit...

Last reply: Barry Giles, Jan 24, 2011, 5:52 pm

July 2010 Addendum applies MERV 13 filtration to OA stream only?

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kim Shinn on Aug 12, 2010, 2:34 pm

If I read the the addendum correctly, instead of...

Last reply: Tristan Roberts, Jan 24, 2011, 5:23 pm

EQc6.1 for enclosed offices

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Megan Snyder on Sep 27, 2010, 4:37 pm

Per a NCv2.2...

Last reply: Todd Sears, Jan 24, 2011, 5:02 pm

Why does v3.0 form only require photos of moisture damage?

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by RETIRED on Jan 19, 2011, 4:26 pm

Hasn't anyone been able to understand why the v3.0 version of the Form for this credit eschews the previous requirements for photographs of...

Last reply: Tristan Roberts, Jan 24, 2011, 5:02 pm

Views Documentation- Section Drawings?

EBOM-2009 IEQc2.4: Daylight and Views
posted by Simon Sue on Nov 25, 2010, 3:26 am

I am currently working on a high rise building that would like to achieve the views credit. I understand that the floor plan drawings must be documented in order to calculate which regularly...

Last reply: Dan Ackerstein, Jan 24, 2011, 4:53 pm

Note about staff sustainability groups

NC-2009 IDc1: Innovation in Design
posted by Tristan Roberts on Jan 24, 2011, 4:40 pm

I thought I would post this helpful tip I just learned about using a staff sustainability group to earn an innovation credit through the common educational path.
A staff sustainability team...

Exclusion of lights, diffusers, grills... and radiant panels?

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Renee Shirey on Jan 24, 2011, 4:20 pm

We have linear radiant panels near our windows and wondered if anybody had been able to justify excluding them from the % of ceiling area that is required to have an...

Perfomance Period

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Danna Sigal on Jan 24, 2011, 3:37 pm

I still need clarification on the amount of time we need to track recyclables and waste for this credit. How long does the performance period need to be? We have limited resources here and the...

Last reply: Dan Ackerstein, Jan 24, 2011, 3:54 pm

Thermal Comfort Survey Software

NC-2009 IEQc7.2: Thermal comfort - verification
posted by Danny Vandoren on Jul 19, 2010, 11:16 am

I was curious if anyone had tried any of the thermal comfort survey software options. I came across too options online:

Berkeley Survey $1000
...

Last reply: Jonathan Weiss, Jan 24, 2011, 2:01 pm

Daylighting calcs w/vision and clerestory glazing.

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Jill Watkins on Dec 16, 2010, 11:52 am

The exterior walls we have designed for a school project are made up of...

Last reply: Eddy Santosa, Jan 24, 2011, 11:42 am